- Splitting
- Advisory Bank
- Reserved for MII
- Reserved for MSE
- Bid to RA Enabled
- Evaluation Method
- MSE Purchase Preference
- MSE Exemption
Splitting
Advisory Bank
Reserved for MII
Reserved for MSE
Bid to RA Enabled
Evaluation Method
MSE Purchase Preference
MSE Exemption
Showing 475 to 500 of 1,004 results.
East Central Railway
6;Air Walker / Stroller - Outdoor Gym Equipment Q3
East Central Railway
45;Enterprise Wi - Fi Enabled ONT Q2/MSE Exemption for Years of
East Central Railway
5;Multifunction Machine MFM V2 Q2/MSE Exemption for Years of
East Central Railway
5;Multifunction Machine MFM V2 Q2/MSE Exemption for Years of
East Central Railway
3;Self - Contained Drinking Water Coolers V3 as per IS 1475
East Central Railway
Corrigendum : Supply Of Bracket For Step Hanger To Llh's Drawing No. Uf/m-68/b, Alt- 1 [ Warranty Period: 30 Months After The Date Of Delivery ]
East Central Railway
Supply Of 16" Brake Unit Complete For Regenerative Brake Blending To Escorts Drg. No. 2ep 6347 Or To Faiveley Part No. Ft0051314-a11 Or Knorr Bremse Drg. No. C214346 (conforming To Rdso Spec N.no.rdso/2013/cg /03) ( Bp Pressure Should Be Set At 1.6 Kg/cm2). [ Warranty Period: 30 Months After The Date Of Delivery ]
East Central Railway
Supply Of Oil Filter Catterpiller Pt No.-ir0726 / Parker Pt No- P7003/ Fleetguard Pt No- Lf3485 [ Wa Rranty Period: 30 Months After The Date Of Delivery ]
East Central Railway
Corrigendum : Supply Of Emu/memu Motor Coaches, Kpc Make Air Compressor Type 3hc-55, 18 Month Overhauli Ng Kit Specification/drg. No. As Per Kpc Part No. 0912012400 And Confirming To Rdso Smi No. Rdso/p E/smi/emu/0041- 2008(rev-0)-august2008. Each Kit Consists Of 51 Items. [ Warranty Period: 30 Mont Hs After The Date Of Delivery ]
East Central Railway
4;Mini Extension Pole Cum Tripod Cum Shooting Grip
East Central Railway
Supply Of Sophisticated Instruments And Equipment Required For Hospital Use:- Led Light Source With Fi Ber Optic Light Cable [ Warranty Period: 30 Months After The Date Of Delivery ]
East Central Railway
Supply Of Cab Activation Key Switch For Wag-9. Drg/specification: - Clw/es/3/0074 [ Warranty P Eriod: 30 Months After The Date Of Delivery ]
East Central Railway
Supply Of 1/2" Braided Rubber Hose With Fittings Delivery Pipe For Baby Compressor Specification :- Clw Drg No. 0/3/65/402. With Latest Alt. [ Warranty Period: 30 Months After The Date Of Delivery ]
East Central Railway
Supply Of Ointment. Eberconazole + Mometasone 5% ,15 Gram Tube ]
East Central Railway
Supply Of Fore Arm Sling With Pouch(m) ]
East Central Railway
Supply Of Acetal Homopolymer Guide Bush To Rdso Sk No. 84102, It.- 1, Alt.- 5, Step Size- A And R Dso Specn. No. C 8215 Rev.-2, Amend 1 Of April 1992. [ Warranty Period: 30 Months After The Date O F Delivery ]
East Central Railway
Supply Of Rubber Based Adhesive Dendrite To Icf Specn No. Icf/m/d/specn.-028, Rev.4 [ Warrant Y Period: 30 Months After The Date Of Delivery ]
East Central Railway
Supply Of Forwarding Note (form No.-com/f-4/com/f-7/revd-1990) Size-29 X21 Cm, 60 Gsm Both Side Printing , One Book Containing 100 Pages. Sample Attached ]
East Central Railway
Supply Of Brush Paints & Varnishes (flat) Size :- 38mm As Per Is : 384-2002 & Bristles To 1844-199 3 Is-384-79 & Bristles To Is-1844-76 [ Warranty Period: 30 Months After The Date Of Delivery ]
East Central Railway
Supply Of Filling Pipe Cap For Btpn Wagon To Rdso Drg. No. Wd-86081-s-61, Item No. 20, Alt. No. 13. [ Warranty Period: 30 Months After The Date Of Delivery ]
East Central Railway
Supply Of Mushroom Head Push Button Switch (bpvg) Front Dimension: 40 Mm. Cut Out: 22.5 Mm & Bl Ue Colour 110v Dc 1.5a As Per Clw Specn. No. Clw/es/3/0072 Alt-i And Rdso Ms No. Rdso/2024/el/ms/0 505 (rev 1). [ Warranty Period: 30 Months After The Date Of Delivery ]
East Central Railway
Supply Of Energy Card 415v/300a To Medha Part No: Sp922101011. [ Warranty Period: 30 Mont Hs After The Date Of Delivery ]
East Central Railway
Supply Of Hss Taper Shank Twist Drill Bit 17.5 Mm. Dia. Make- Jk,it,addision,miranda Or Similar. [ Wa Rranty Period: 30 Months After The Date Of Delivery ]
East Central Railway
Supply Of Electronic Torque Wrench Tester (capacity 5-1000 Nm) As Per Attached Annexure A. Make - Gedore, Knorbar, Baker Or Similar Reputed Make. [ Warranty Period: 30 Months After The Date Of Delivery ]
East Central Railway
Supply Of Tab./cap. Empagliflozin 12.5mg + Metformin 1000mg In Al/blister Packing ]