Govt. Tenders
Found 1457 tenders for your search .
Supply Of Set Of Frp Side Wall Panels For Lhb Fac Coaches, As Per Set List: Mplspl1acea Ver Sion-23. Packing Instructions Mcf Spi(fur)-001 [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 14 Feb 2025 | |
Bid Submission End Date | 07 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 14 Feb 2025 | |
Bid Submission End Date | 07 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Bolster Spring Outer To Drg.no.contr-9404,s/7,it-1,alt-5 For Blc Wagon. [ Warranty Period : 30 Months After The Date Of Delivery ]
Read MorePublish Date | 14 Feb 2025 | |
Bid Submission End Date | 07 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 14 Feb 2025 | |
Bid Submission End Date | 07 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Hydraulic Crimping Tool Consisting Of Hydraulic Compression Head And Foot Operated Pump, S Uitable Crimp Connecting Hose Pipe, To Crimp The Cables Of Size From 25 Sq Mm To 400 Sq Mm, Supply Shall B E With Standard Accessories And Crimping Die Sockets Of Sizes 25, 35,50,70,95,120,150,185,240,300 And 40 0 Sq Mm To Jainson Model No. Varun - 400. Make-jainson,ashwin,calter,dowells,sapsons. Firms Offer Make/ Brand: Jainson Varun 400 Or Similar [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 14 Feb 2025 | |
Bid Submission End Date | 07 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 14 Feb 2025 | |
Bid Submission End Date | 07 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Foot Step Arrangement For G7 Loco.(one Set Consist Of 02 Nos. L H & 02 Nos. R.h. Each) To Clw's Drg. No.06/1/65/49 Alt.- 3. [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 14 Feb 2025 | |
Bid Submission End Date | 27 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 14 Feb 2025 | |
Bid Submission End Date | 27 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Set Of Root Pump 01 Set Consisting Of 07 Item (i) Root Pump Rotary Set (2 No) ,qty-01 No (ii) B Earing ,qty-06 No (iii) Oil Seal, Qty-02 No (iv) Vacuum Seal ,qty-02 No (v) Metal Sprocket , Qty-02 Nos (vi) M Etal Sprocket Support, Qty-01 No.free Installation By Firm. [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 14 Feb 2025 | |
Bid Submission End Date | 27 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 14 Feb 2025 | |
Bid Submission End Date | 27 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Squeeze Brush With Aluminium Handle Of Length 48 Inch, Diameter - 20 Mm. Length Of The Br Ush - 12 Inch(approx.). The Squeeze Brush Having Bristle In One Side And Rubber Strip In Other Side. [ Warr Anty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 14 Feb 2025 | |
Bid Submission End Date | 28 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 14 Feb 2025 | |
Bid Submission End Date | 28 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Installation And Commissioning Of Microprocessor Based Air Flow Relay Test Unit As Pe R Annexure Attached. [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 14 Feb 2025 | |
Bid Submission End Date | 28 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 14 Feb 2025 | |
Bid Submission End Date | 28 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Elastic C Stop (lateral And Vertical) Cat No.r/9/0012 C&d No.t222/028 Specn: Clw Spec.n O.clw/ms/3/010.accecpted Make Clw's Item Id-2100211 [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 14 Feb 2025 | |
Bid Submission End Date | 28 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 14 Feb 2025 | |
Bid Submission End Date | 28 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Magnet Valve (vef) Kbi Part No. I88806/110 Or Stk8822/110 [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 14 Feb 2025 | |
Bid Submission End Date | 28 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 14 Feb 2025 | |
Bid Submission End Date | 28 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Condenser & Evaporator Cleaning Solution Similar In All Respect To Part No-is 260100562 Of 3 M. Universal Cleaner, Solvent Base, Density - 0,85 G/ml, Drying Time -10 Minutes, Flashpoint -14 Degree C, Highly Flammable, Application Temperature- From +5 Degree C To +40 Degree C For Ready To Use Version Electrical & Mechanical Components. [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 14 Feb 2025 | |
Bid Submission End Date | 28 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 14 Feb 2025 | |
Bid Submission End Date | 28 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Flushing Switch Assembly ( 5/2 Spool Valve Type ) Pneumatic Operated Sp Ecification 1. Operating Air Pressure = 10 Bar (maximum) 2. 5/2 Spool Valve Type (5 Port 2 Posi Tions) As Under (a) - Total Port = 5 Nos. (b) - Inlet Port = 1 No., Depth : 10 Mm. To 12 Mm., Threa D Diameter : 1/8 Inch Or 1/4 Inch. (c) - Outer Post = 2 Nos, Depth : 10 Mm. To 12 Mm., Thread Dia Meter : 1/8 Inch Or I/4 Inch (d) - Exhaust Port = 2 Nos., Depth : 12 Mm. To 15 Mm, Thread Diamete R : 1/8 Inch Or I/4 Inch (e) - Total Length Of Flushing Switch Assembly (without Knob Plates) Is = 130 Mm. (approximately). [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 14 Feb 2025 | |
Bid Submission End Date | 28 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 14 Feb 2025 | |
Bid Submission End Date | 28 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Set Of Screw Spindle & Screw Nut One Set Consists Of One No. Each Of The Following Items (1) S Crew Spindle As Per Jmp Drg. No. 80/62 Alt 8 (2) Screw Nut As Per Jmp Drg. No. Wj-6/m Alt 2 With Four Nos. C Heck Nut In Each Screw Spindle As Per Jmp Drg.no. Wj-11/m Alt-6. (mat. Spec.is:2062 E 250a / Br. [ Warran Ty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 14 Feb 2025 | |
Bid Submission End Date | 28 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 14 Feb 2025 | |
Bid Submission End Date | 28 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Set Of Safety Washers For The Wheel Set Assesemblies And Under Gear Assemblies Of Wa P7/wag9 Three Phase Locomotives Consisting Of Two Items As Follows: (1) Safety Washer (vs-12) For M 12 Bolt. Article No-182-00361-004 Of Drg.no-182-00361, Qty Per Wheel Set-57 Nos. (2) Safety Washer (vs-6) For M6 Bolt. Article No-182- 00361-001 Of Drg. No-182-00361, Qty Per Wheel Set-03 Nos ]
Read MorePublish Date | 14 Feb 2025 | |
Bid Submission End Date | 28 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 14 Feb 2025 | |
Bid Submission End Date | 28 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Set Of Brass Pipe Fittings For Wiper & Gauges For Three Phase Loco As Per Clw Specifications No. Clw/ts/99/cf/5 Alt-8 Or Latest. ( 1 Set Consists 6 Items 36 Nos. ) As Per Attached Annexure-1. (material To Be Procured From Clw Approved Sources Only.) [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 14 Feb 2025 | |
Bid Submission End Date | 28 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 14 Feb 2025 | |
Bid Submission End Date | 28 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Rotary Switch Conforming To Salzer Makes 16a-s16-61121-b03-tdyr. For Use In Power Car For As Plant Selector Switch A,b,a+b,off Accepted Make :- Salzer,l&t, Siemens,ge,aig. [ Warranty Peri Od: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 14 Feb 2025 | |
Bid Submission End Date | 28 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 14 Feb 2025 | |
Bid Submission End Date | 28 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Set Of Tamping Tools Tctt For Uni4s.one Set Consists Of 1) Big Tamping Tool As Per Plasserpa Rt No.cu30.6820be And Rdso Drawingno.rdso/tm/01a/16=08 No's, 2) Small Tamping Tool Asper Plasser P Art No.cu30.6220be And Rdso Drawingno.rdso/tm/01b/16=08 No's. Total No Of Tools :16no's, Andrdso S Pecification No.tm/hm/6/320(rev-3, July2019),make : Plasser Or Its Equivalent [ Warranty Period: 30 Mont Hs After The Date Of Delivery ]
Read MorePublish Date | 14 Feb 2025 | |
Bid Submission End Date | 12 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 14 Feb 2025 | |
Bid Submission End Date | 12 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Copper Crimping Lug L Shape Of Size 120 Sq.mm For Coupling Socket And Plug Ass Embly Corresponding To Rcf Drawing No.lw71327 Alt. A. And Rcf Spec No. Edts 105 Rev.e, Amn Dt 1, 2&3 [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 14 Feb 2025 | |
Bid Submission End Date | 07 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 14 Feb 2025 | |
Bid Submission End Date | 07 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of 110 Volt Ac Heavy Duty Electric Circular Saw Machine With 184 Mm Blade As Per Schedule Sp Ecification Annexure Attached [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 14 Feb 2025 | |
Bid Submission End Date | 07 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 14 Feb 2025 | |
Bid Submission End Date | 07 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Kit For Ep Brake Unit Level -ii As Per Ftil Part No. Ft 0051314-k01. As Per Annexure Attached [set Consisting 08 Items ]
Read MorePublish Date | 14 Feb 2025 | |
Bid Submission End Date | 07 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 14 Feb 2025 | |
Bid Submission End Date | 07 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Overhauling Kit And Spares Of Kb Make Fiba System Consisting Of 06 Items As Per Attached A Nnexure. [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 14 Feb 2025 | |
Bid Submission End Date | 07 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 14 Feb 2025 | |
Bid Submission End Date | 07 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Mild Steel Plate 20x2500x9000 Mm To Specification Is:2062:2011 E 250 A With Cu. [ W Arranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 14 Feb 2025 | |
Bid Submission End Date | 07 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 14 Feb 2025 | |
Bid Submission End Date | 07 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Monthly Basis Cab Taxi Hiring Services - SUV 1500 km x 320 hours Local Contract Period/ 2 Years Years of Past Experience Required for same/similar service/ /0 /0 2 Year s Past Experience of Similar Services required/ Yes MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Experience CriteriaCertificate Requested in ATC In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid/ No Bid to RA enabled/ No
Read MorePublish Date | 13 Feb 2025 | |
Bid Submission End Date | 24 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | 9.84 L |
Publish Date | 13 Feb 2025 | |
Bid Submission End Date | 24 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | 9.84 L |
Custom Bid for Services - CONTRACTUAL WORK OF CLEANING HOSPITALITY AND PANTRY SERVICES AT OFFICERS REST HOUSE BASANT ROAD NEW DELHI Similar Category/ Cleaning Sanitation and Disinfection Service - Outcome Based Manpower Outsourcing Services - Minimum wage Contract Period/ 2 Years Years of Past Experience Required for same/similar service/ 12 12 2 Year s Past Experience of Similar Services required/ Yes MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Experience CriteriaBidder TurnoverCertificate Requested in ATC In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Read MorePublish Date | 13 Feb 2025 | |
Bid Submission End Date | 07 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | 18.98 L |
Publish Date | 13 Feb 2025 | |
Bid Submission End Date | 07 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | 18.98 L |
Rehabilitation/overhauling Of Coaches To Reduce Cycle Downtime During Major Attention For 106 Coaches, Against Sanction Bulk Rsp Work Vide Pb No-752/2024-25 At Carriage Complex, Kanchrapara Within A Period Of 01 (one) Year
Read MorePublish Date | 17 Feb 2025 | |
Bid Submission End Date | 11 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 17 Feb 2025 | |
Bid Submission End Date | 11 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
(i)improvement And Provision Of Amenities For Divyangjan Passenger, Improvement Of Toilets And Provision Of Signage In The Section Of Aen/llh & (ii) Replacement Of Old And Overaged Optical Fiber Cable Container With New Optical Fiber Cable Room Over Howrah Division (phase-i).
Read MorePublish Date | 17 Feb 2025 | |
Bid Submission End Date | 11 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 17 Feb 2025 | |
Bid Submission End Date | 11 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |