- Splitting
- Advisory Bank
- Reserved for MII
- Reserved for MSE
- Bid to RA Enabled
- Evaluation Method
- MSE Purchase Preference
- MSE Exemption
Splitting
Advisory Bank
Reserved for MII
Reserved for MSE
Bid to RA Enabled
Evaluation Method
MSE Purchase Preference
MSE Exemption
Showing 25 to 50 of 2,667 results.
PUBLIC HEALTH ENGINEERING DEPARTMENT
Corrigendum : Creation Of 2 Nos Additional Source By Sinking Of Additional Tube-well By D.r. Rig Method, Construction Of 5.4 M X 3.6 M Switch Room With Sanitary And Water Supply Arrangement, Construction Of Boundary Wall For Debanandapur Piped Water Supply Scheme
PUBLIC HEALTH ENGINEERING DEPARTMENT
Corrigendum : Providing Balance Fhtc At The Left Out Portions Including Restoration Of Damaged Road Due To Lalying Of Pipeline Of Keota Pwss Under Chinsurah Mogra Block Of Chinsurah Sub-division, Phe Dte.
PUBLIC HEALTH ENGINEERING DEPARTMENT
Corrigendum : Laying Of Hdpe Pipeline And Providing Fhtc At The Left Out Portions Including Restoration Of Damaged Road Due To Lalying Of Pipeline Of Naldanga Pwss Under Chinsurah Mogra Block Of Chinsurah Sub-division, Phe Dte.
PUBLIC HEALTH ENGINEERING DEPARTMENT
Corrigendum : Laying Of Balance Hdpe Pipeline And Providing Balance Fhtc At The Left Out Portions Including Restoration Of Damaged Road Due To Lalying Of Pipeline Of Kola Pwss
PUBLIC HEALTH ENGINEERING DEPARTMENT
Corrigendum : Laying Of Balance Hdpe Pipeline For Providing Fhtc At The Left Out Portions Including Restoration Of Damaged Road Due To Lalying Of Pipeline Of Jayrambati Pwss
PUBLIC HEALTH ENGINEERING DEPARTMENT
Corrigendum : Sinking Of 1no. Tube-well By D.r. Rig Method, Construction Of 5.40 M X 3.60 M Switch Room With Sanitary And Water Supply Arrangement, Construction Of Boundary Wall And Connection Of Tubewell Of Mayapur Pwss
PUBLIC HEALTH ENGINEERING DEPARTMENT
Corrigendum : Providing Balance Fhtc At The Left Out Portions Including Restoration Of Damaged Road Due To Lalying Of Pipeline Of Sibaichandi Pwss Under Dhaniakhali Block Of Chinsurah Sub-division, Phe Dte.
PUBLIC HEALTH ENGINEERING DEPARTMENT
Corrigendum : Sinking Of 1no. Tube-well By D.r. Rig Method, Construction Of 3.65 M X 3.0 M Switch Room With Sanitary And Water Supply Arrangement, Construction Of Boundary Wall And Connection Of Tubewell Of Bhangamora Pwss
PUBLIC HEALTH ENGINEERING DEPARTMENT
Corrigendum : Sinking Of 1no. Tube-well By D.r. Rig Method, Construction Of 5.40 M X 3.60 M Switch Room With Sanitary And Water Supply Arrangement, Construction Of Boundary Wall And Connection Of Tubewell Of Purbakrishnapur Pwss
PUBLIC HEALTH ENGINEERING DEPARTMENT
Corrigendum : Sinking Of 1no. Tube-well By D.r. Rig Method, Construction Of 5.40 M X 3.60 M Switch Room With Sanitary And Water Supply Arrangement, Construction Of Boundary Wall And Connection Of Tubewell Of Kelepara Pwss
PUBLIC HEALTH ENGINEERING DEPARTMENT
Corrigendum : Laying Rising Main To Connect Proposed Tube Well With Distribution System With Ancillary Works Of Pratapnagar Piped Water Supply Scheme Under Arambagh Sub-division Of Hooghly Division P.h.e Dte.
PUBLIC HEALTH ENGINEERING DEPARTMENT
Corrigendum : Sinking Of 1no. Tube-well By D.r. Rig Method, Construction Of 3.65 M X 3.0 M Switch Room With Sanitary And Water Supply Arrangement, Construction Of Boundary Wall And Connection Of Tubewell Of Srirampur Pwss
PUBLIC HEALTH ENGINEERING DEPARTMENT
Corrigendum : Sinking Of Additional Tube-well By D.r. Rig Method, Construction Of 3.65 M X 3.0 M Switch Room With Sanitary And Water Supply Arrangement, Construction Of Boundary Wall And Connection Of Tubewell Of Saidpur Pwss
PUBLIC HEALTH ENGINEERING DEPARTMENT
Corrigendum : Sinking Of 1no. Tube-well By D.r. Rig Method, Construction Of 5.40 M X 3.60 M Switch Room With Sanitary And Water Supply Arrangement, Construction Of Boundary Wall And Connection Of Tubewell Of Rasulpur Pwss
PUBLIC HEALTH ENGINEERING DEPARTMENT
Corrigendum : Construction Of 3.65 M X 3.0 M Switch Room With Sanitary And Water Supply Arrangement Of Srirampur Piped Water Supply Scheme Under Arambagh Sub-division Of Hooghly Division P.h.e Dte.
PUBLIC HEALTH ENGINEERING DEPARTMENT
Corrigendum : Repairing Of Existing Switch Room, Boundary Wall And Construction Toilet At 2nd T/w Site For Kapsit W/s Scheme Under Arambagh Sub-division Of Hooghly Division, Phe Dte.
PUBLIC HEALTH ENGINEERING DEPARTMENT
Corrigendum : Laying Of Balance Hdpe Pipeline For Providing Fhtc At The Left Out Portions Including Restoration Of Damaged Road Due To Lalying Of Pipeline Of Dighir Pwss Under Dhaniakhali Block Of Chinsurah Sub-division, Phe Dte
PUBLIC HEALTH ENGINEERING DEPARTMENT
Corrigendum : Repairing Of Existing Switch Room, Boundary Wall And Construction Toilet At 2nd T/w Site For Bhangamora W/s Scheme Under Arambagh Sub-division Of Hooghly Division, Phe Dte.
PUBLIC HEALTH ENGINEERING DEPARTMENT
Corrigendum : Repairing Of Existing Switch Room, Boundary Wall And Construction Toilet At 2nd T/w Site For Kanpur W/s Scheme Under Arambagh Sub-division Of Hooghly Division, Phe Dte.
PUBLIC HEALTH ENGINEERING DEPARTMENT
Corrigendum : Repairing Of Existing Switch Room, Boundary Wall And Construction Toilet At 2nd T/w Site For Pratapnagar W/s Scheme Under Arambagh Sub-division Of Hooghly Division, Phe Dte.
PUBLIC HEALTH ENGINEERING DEPARTMENT
Corrigendum : Left Out Portion Of Distribution Mechanism Under Bhangamora Pwss Under Pursurah Block, Under Arambagh Sub-division Of Hooghly Division, P.h.e, Dte.
PUBLIC HEALTH ENGINEERING DEPARTMENT
Corrigendum : Left Out Portion Of Distribution Mechanism Under Kanpur Pwss Under Arambagh Block, Under Arambagh Sub Division Of Hooghly Division, P.h.e, Dte.
PUBLIC HEALTH ENGINEERING DEPARTMENT
Corrigendum : Laying Of Balance Hdpe Pipeline For Providing Fhtc At The Left Out Portions Including Restoration Of Damaged Road Due To Lalying Of Pipeline Of Sibaichandi Pwss
PUBLIC HEALTH ENGINEERING DEPARTMENT
Corrigendum : Construction Of Protection Wall At 1st Site Of Mayapur Zone-ii Piped Water Supply Scheme Under Arambagh Sub-division Of Hooghly Division P.h.e Dte.
PUBLIC HEALTH ENGINEERING DEPARTMENT
Corrigendum : Sinking Of 2 Nos Tube-well By D.r. Rig Method, Construction Of 2 Nos 3.65 M X 3.0 M Switch Room With Sanitary And Water Supply Arrangement, Construction Of 2 Nos Boundary Wall And Connection Of 2 Nostubewell Of Saidpur Zone-ii Pwss