Govt. Tenders
Found 97 tenders for your search .
Supply Of Set Of Aluminium Floor End Profile For Antyodaya Coach
Read MorePublish Date | 07 Apr 2025 | |
Bid Submission End Date | 02 May 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 07 Apr 2025 | |
Bid Submission End Date | 02 May 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Stainless Steel Rod Dia 8mm
Read MorePublish Date | 07 Apr 2025 | |
Bid Submission End Date | 28 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 07 Apr 2025 | |
Bid Submission End Date | 28 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Urine Chemistry Analyser.
Read MorePublish Date | 08 Apr 2025 | |
Bid Submission End Date | 22 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 08 Apr 2025 | |
Bid Submission End Date | 22 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Set Of Chair Angle For Lhb Scn & Gs Coaches.
Read MorePublish Date | 01 Apr 2025 | |
Bid Submission End Date | 28 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 01 Apr 2025 | |
Bid Submission End Date | 28 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply & Installation Of Epdm Modular Based Cable/ Conduit Sealing System For On-board Panel Of Switch Board Cabinet In Lhb Non Ac Coaches., As Per Drawing: Edml 228 Rev. 0, Corr-1, Packing Instruction: As Per Standard Packing. It Should Be Ensured That It Em Should Not Rub During Transportation. The Item Should Be Packed With Adequate St Rength. Transit Damage , If Any , Shall Be At The Cost Of Supplier. [ Warranty Period: 30 M Onths After The Date Of Delivery ]
Read MorePublish Date | 01 Apr 2025 | |
Bid Submission End Date | 29 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 01 Apr 2025 | |
Bid Submission End Date | 29 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Switch Plate Assembly For Lhb Eog Ac Hot
Read MorePublish Date | 01 Apr 2025 | |
Bid Submission End Date | 29 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 01 Apr 2025 | |
Bid Submission End Date | 29 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Camc Contract Of Water Cooler, Water Purifier And Air Conditioner For One-year Workshop Area, Rail Coach Factory Kapurthala.
Read MorePublish Date | 02 Apr 2025 | |
Bid Submission End Date | 24 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 02 Apr 2025 | |
Bid Submission End Date | 24 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Turn Blade Knives Hw;
Read MorePublish Date | 02 Apr 2025 | |
Bid Submission End Date | 23 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 02 Apr 2025 | |
Bid Submission End Date | 23 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Set Of Frp Modular Toilet With Manufcturing Process Smc For Lhb Scn And Gs Amrit Bharat Coaches / Set Of Frp Modular Toilet With Manufacturing Process Smc For Lhb Slr Hog Amrit Bharat Coaches.
Read MorePublish Date | 02 Apr 2025 | |
Bid Submission End Date | 02 May 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 02 Apr 2025 | |
Bid Submission End Date | 02 May 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Welding Activities In Lwscn And Lsdd Shells As Per Scope Of Work.
Read MorePublish Date | 04 Apr 2025 | |
Bid Submission End Date | 30 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 04 Apr 2025 | |
Bid Submission End Date | 30 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Certification Of Welding Standards Iso 3834-2-2021 & En 15085-2-2020 Of Rcf
Read MorePublish Date | 04 Apr 2025 | |
Bid Submission End Date | 05 May 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 04 Apr 2025 | |
Bid Submission End Date | 05 May 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Industrial X-ray Film Size 15 Inch X 12 Inch, As Per Drawing: As Per Specificatio N No. C&m/spec/x-ray/11 Dated 15.11.2011, Quality Plan: N.a. ]
Read MorePublish Date | 04 Apr 2025 | |
Bid Submission End Date | 28 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 04 Apr 2025 | |
Bid Submission End Date | 28 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of 1/2" Sq Drive Ratchet Type Torque Wrench Cap-7-35 Kgf.m (70-340 Nm), As Per Dr Awing: Is: 6789-2003 Or Latest With Calibration Certificate Should Be Provided By The Firm , With Details Of Master Equipment And Calibration Traceability [ Warranty Period: 30 Mo Nths After The Date Of Delivery ]
Read MorePublish Date | 04 Apr 2025 | |
Bid Submission End Date | 28 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 04 Apr 2025 | |
Bid Submission End Date | 28 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Lsdd Shell Fitment And Welding Activities For Year 2025.
Read MorePublish Date | 05 Apr 2025 | |
Bid Submission End Date | 01 May 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 05 Apr 2025 | |
Bid Submission End Date | 01 May 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Set Of Carline Assly. For Lhb Chair Car, As Per Drawing: Mp09rbccar Version 1, Packing Instruction: Carline Assly The Supplier Shall Pack The Three C/set (segments) Of Car Lines In A Suitably Designed Robust Returnable Metallic Cage/structure In Such A Way T Hat Carlines Shall Not Get Entangle, Damaged, Twisted, Dented During Transportation, Storage, Handling And Lifting And To Avoid Scratches On Outer Surface Suitable Enviro Nment Friendly Cushioning Material Is To Be Placed Between Two Segments, Transit Dam Age If Any Shall Be At The Cost Of Supplier. The Packing Cage/structure To Be Fabricated By Using Sq. Tubes Channels/angles Having Sufficient Strength To Bear Approximate 1.5 Tonne Material Load In Static & Moving Condition Of Three Coach Set Of Carline. The Bot Tom Part Of This Packing Cage/pallet Should Be Such That Curvature Profile Of Bottom Carline Should Match With The Profile Of Packing Cage And It Can Accommodate Fork Lif Ter Arms For Lifting And Transportation. It Should Have Standard Clamping/fastening Mechanism To Facilitate Easy Unpacking & Unloading. It Should Have Firm's Identification /color Mark. The Packing Cages Along With Set Of Carlines Supplied In One Lot Be Retained By Rcf & This Cage Set Shall Be Exchanged In The Second Lot Supply And So On. At The End Of The Contract, The Firm Shall Collect The Remaining Returnable Packing Ca Ges From Rcf. It Should Also Be Suitable For Storage Of Carline Under Open Sky. Packing Slip Should Be Pasted On Each Cage Showing P.o. No., Pl No., Description,drg. No./spec, , Qty. , Firm's Name And Address & Despatch Date Etc. For Identification. [ Warranty Period : 30 Months After The Date Of Delivery ]
Read MorePublish Date | 05 Apr 2025 | |
Bid Submission End Date | 06 May 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 05 Apr 2025 | |
Bid Submission End Date | 06 May 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Security Check Paint Marker, (volume: 30 Ml, Nature Of Paste: Highly Visible, Viscous An D Fluorescent) Color - Red, Tip Size 2.9 Mm Extended Nozzle With Variable Point Of 1 Mm & 2 Mm, Make : Ce Ntury Or Similar [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 05 Apr 2025 | |
Bid Submission End Date | 22 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 05 Apr 2025 | |
Bid Submission End Date | 22 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Cutting Blade For Vinyl Cutting Plotter Of M/s. Graphtech. Spec. Part No. Cb09ub . [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 05 Apr 2025 | |
Bid Submission End Date | 22 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 05 Apr 2025 | |
Bid Submission End Date | 22 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Dol Reversing Starter In Ss Enclosure Coil 380/415 Vac, Over Load Relay 2. 4 - 3.8 Amps. Cat No- Narglen, Bch Or Equivalent. Drg:nil [ Warranty Period: 12 Months After The Date Of Delivery ]
Read MorePublish Date | 05 Apr 2025 | |
Bid Submission End Date | 22 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 05 Apr 2025 | |
Bid Submission End Date | 22 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Flash Back Arrestor For Acetlyene Gas Regulator Conform To Bis:6158-198 2 Or Iso: 5175-1987 Or Latest Version. Max. Inlet Pressure-10 Bar (150 Psi). Make/brand-m Esser Or Ador Or L&t Or Esab Part No. 0430-0100-402 Or Gce Part No.0764471. Only Oem O R Their Authorised Dealer Can Participate In The Tender. Work Test Certificate Is Requi Red . Sample To Be Got Approved From Consignee Before Bulk Supply. [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 05 Apr 2025 | |
Bid Submission End Date | 22 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 05 Apr 2025 | |
Bid Submission End Date | 22 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Frame Part 4, Complete For Lhb Coaches, As Per Drawing: 2 10113.0.21.500.163 A Lt -r, Packing Instruction: No Special Packing Required [ Warranty Period: 30 Months After The D Ate Of Delivery ]
Read MorePublish Date | 03 Apr 2025 | |
Bid Submission End Date | 25 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 03 Apr 2025 | |
Bid Submission End Date | 25 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Roof Ventilator Arrgt
Read MorePublish Date | 03 Apr 2025 | |
Bid Submission End Date | 02 May 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 03 Apr 2025 | |
Bid Submission End Date | 02 May 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Integrated Wtcc For Lhb Gs & Scn Amrit Bharat Coaches
Read MorePublish Date | 03 Apr 2025 | |
Bid Submission End Date | 05 May 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 03 Apr 2025 | |
Bid Submission End Date | 05 May 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Roof Arch For Lhb Non-ac Coach,
Read MorePublish Date | 03 Apr 2025 | |
Bid Submission End Date | 05 May 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 03 Apr 2025 | |
Bid Submission End Date | 05 May 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Set Of Axle End Cover For Lhb Bogies, As Per Drawing: Mplbgaeclhb Version 1 [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 17 Mar 2025 | |
Bid Submission End Date | 22 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 17 Mar 2025 | |
Bid Submission End Date | 22 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Set Of End Construction For 3 Phase Memu/tc Medha Coaches, As Per Drawing: Mp23end3ph Version 0, Packing Instruction: 1. The Supplier Shall Pack The End Wall In A Suit Ably Designed Returnable Fixture In Such A Way That End Wall Shall Not Get Scratched, Damaged, Twisted During Transportation, Storage And Lifting And To Avoid Scratches O N Outer Surface. It Should Be Seperated By Suitable Environment Friendly Blocks To Ava Oid Rubbing Of Two Endwall Surfaces . It Should Have Standard Clamping /fastening Me Chanism So That It Can Be Opened Easily. It Should Have Firm's Identification Mark. 2. Firs T Returanable Fixture Along With End Wall Be Retained By Rcf & This Fixture Shall Be Ex Changed In The Second Lot Supply And So On. At The End Of The Contact, The Firm Shall C Ollect The Remaining Returnable Packing Fixture From Rcf. 3. The Packing Fixture/frame To Be Fabricated Having Sufficient Strenght To Bear Approximate 2 Tonne Load In Static & Moving Condition Of Two Coach Sets Of End Wall. 4. The Fixture /frame/pallet Should Be Designed So That The Packed End Wall Preferably Remain In Vertical Position To Minim Ize Surface Area. 5. It Should Also Be Suitable For Storage Of End Wallunder Open Sky. [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 11 Mar 2025 | |
Bid Submission End Date | 22 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 11 Mar 2025 | |
Bid Submission End Date | 22 Apr 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |