Govt. Tenders
Found 340 tenders for your search .
Air Insulated Distribution Type Bus Trunking Of 04 Pole (03 Phase 4 Wire System) Capacity 250 Amp. For Bogie Shop In Rcf Workshop Kapurthala.
Read MorePublish Date | 28 Jun 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 28 Jun 2025 | |
Bid Submission End Date | 28 Jul 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Polyurethane Tubing 8x1.25 Make-festo Or Smc Or Pneumax Pneumatics. [ Warran Ty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 28 Jun 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 28 Jun 2025 | |
Bid Submission End Date | 15 Jul 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Sevelamer Hcl 400 Mg Tab ]
Read MorePublish Date | 28 Jun 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 28 Jun 2025 | |
Bid Submission End Date | 28 Jul 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Portable Type Rail Weigh Bridge As Per Spec No. Mech/m&p/4000/gm Rev.- Nil Dated.08/05/2 025 Along With Preventive Maintenance During Warranty Period. ]
Read MorePublish Date | 28 Jun 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 28 Jun 2025 | |
Bid Submission End Date | 28 Jul 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Dimension Of Non Asbestos Based 'k' Type High Friction Composite Break Blo Ck, As Per Drawing: Rdso/sk-80029 Alt.'4', Quality Plan: N.a. [ Warranty Period: 30 Months After T He Date Of Delivery ]
Read MorePublish Date | 29 Jun 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 29 Jun 2025 | |
Bid Submission End Date | 15 Jul 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Bracket, As Per Drawing: 1254985 Ver. 01r And Specification No. S355j2 W+n, En :10025-5:2004, Packing Instruction: Suitably Packed In Jute Bags [ Warranty Period: 30 Months A Fter The Date Of Delivery ]
Read MorePublish Date | 29 Jun 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 29 Jun 2025 | |
Bid Submission End Date | 16 Jul 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Safety Chain Complete, As Per Drawing: Emu/m-3-2-070 Col-1 Alt.'br', Packing Instr Uction: Suitably Packed In Jute Bags [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 29 Jun 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 29 Jun 2025 | |
Bid Submission End Date | 16 Jul 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Primary Damper Bracket, As Per Drawing: 1267711 Ver. 01r, Packing Instruction: Su Itably Packed In Jute Bags [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 29 Jun 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 29 Jun 2025 | |
Bid Submission End Date | 22 Jul 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Set Of Control Equipment Items (bogie) For 3-phase Memu/dmc & Tc Bogie, As Per Drawing: Items No. 1, 19, 29, 32 & 34 Only Of Drawuing No. 61705003 Alt.'nil'. Packing Ins Truction: Packing As Per Standard Packing. It Should Be Ensured That Item Should Not R Ub During Transportation : The Item Should Be Packed With Adequate Strength. Transit Damage If Any Shall Be At The Cost Of Supplier. [ Warranty Period: 30 Months After The Date O F Delivery ]
Read MorePublish Date | 29 Jun 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 29 Jun 2025 | |
Bid Submission End Date | 31 Jul 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Anti Roll Bar-(qr Code As Per Cde/rcf Letter No. Md44121 Dt. 24.11.2021.), As Per Drawing: 1267519 Ver. 01r1 And Specification No.51crmov4;din17221 & 17.619 100 00 And Md St-154 Rev.'nil', Quality Plan: N.a. [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 26 Jun 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 26 Jun 2025 | |
Bid Submission End Date | 23 Jul 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Purified Vero Cell Rabies Vaccine 2.5 Iu/ml Single Dose ]
Read MorePublish Date | 26 Jun 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 26 Jun 2025 | |
Bid Submission End Date | 15 Jul 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Capacitor Bank For Lhb Eog Coaches, As Per Drawing: Edml130,rev-1,corr.-7,ty Pe-3, Packing Instruction: As Per Standard Packing. It Should Be Ensured That Item Should N Ot Rub During Transportation. The Item Should Be Packed With Adequate Strength. Tran Sit Damage , If Any , Shall Be At The Cost Of Supplier. [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 26 Jun 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 26 Jun 2025 | |
Bid Submission End Date | 04 Aug 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Bogie Bolster With In Built Reservoir For Memu Ob 3ph Memu/dmc & Tc Coach Es, As Per Drawing: Icf/sk3-0-4-001 Alt.'dr', Packing Instruction: Packing Instruction Of Memu B Ogie Bolster ( Pl No. 33504088, 31047130, 31047129) 1. All Machined Surface Shall Be Prot Ected From Oxidation And Corrosion By Applying Two Coats Of Rust Preventive Oil To Is Spec. No. 493 Pt. I Viscosity Grade 46. 2. The Packing Shall Be Such That All The Machined Surface Shall Be Properly Protected Against Rubbing /impact/scratches With Each Othe R With Any Mode Of Transportation I.e Wagon/truck/trailers Etc. 3. The Items Should Be Packed In 04 Nos In Iron Box Pallet Prepared By Firm Suitable For Said Items. The Items Sh Ould Be Separated To Avoid Rubbing And Tightened With The Help Of Rods/channel Using Nuts And Bolts. The Packing Shall Be Such That Transit Damage If Any Shall Be At The Co St Of Supplier Till Unloading In Shell Depot. 4 Each Packing Should Have An Identificatio N Showing P.o. No., Pl No. Description, Drawing No./spec., Quantity, Firm's Name & Addres S And Dispatch Detail Etc. Note:- Iron Box Pallet Shall Be Returned To Firm When Empty I F Agreed By Respective Depots. , Proction Procedure: As Per Drawing [ Warranty Period: 66 M Onths After The Date Of Delivery ]
Read MorePublish Date | 26 Jun 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 26 Jun 2025 | |
Bid Submission End Date | 24 Jul 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Final Roof Element, As Per Drawing: Lr10161 Alt 'nil', Packing Instruction: Return Able & Re-usable Metallic Pallet Item Should Be Supplied In Returnable & Re-usable Palle T Made Of Steel. The Design Of The Pallet Should Be : " Water And Fire Proof. " Rust Free. " Having Good Strength To Weight Ratio. " Suitable For Stacking In Several Layers, Comp Atible With Each Other When Stacked. " Able To Withstand The Rough Handling Of Comm On Logistic Systems Such As Fork Lifter, Cranes Etc. " Able To Facilitate The Storing, Handling And Unloading With Minimum Labour And Time. " Having The Interior Of The Pall Et Lined With Suitable Material (like Frp ) So As To Prevent Damage To The Item Being Tra Nsported. While Stacking The Item Inside The Pallet, There Should Be Minimum Use Of Disp Osable Packing. " The Pallet Should Have Firm's Logo For Identification. Firm Should Als O Indicate Pl No., Description Of Item On The Pallet. Note : 1.for Packing The Individual It Em(s), The Use Of Material Which Are Not Environment Friendly Such As Wood/polyethen E/plastic Is Prohibited, However The Environment Friendly Plastic Can Be Used. 2.the Ite M Should Be Packed In Such A Way That It Should Not Rub During Transportation. The In- Transit Damage, If Any, Shall Be At Cost Of The Supplier. 3.the Design To Be Got Approved By The Firm From Cde/rcf Before Initiating Manufacturing. [ Warranty Period: 30 Months Af Ter The Date Of Delivery ]
Read MorePublish Date | 30 Jun 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 30 Jun 2025 | |
Bid Submission End Date | 30 Jul 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Set Of Secondary Vertical Damper Bkt. (air Susp.), As Per Drawing: Mpbgvdblhbas Version 0, Packing Instruction: Suitably Packed In Jute Bags [ Warranty Period : 30 Months After The Date Of Delivery ]
Read MorePublish Date | 30 Jun 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 30 Jun 2025 | |
Bid Submission End Date | 21 Jul 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Fire Extinguisher With Anti-theft Arrangement In Non Ac Coaches, As Per Dra Wing/specification:cc64262 Alt F. [ Warranty Period: 60 Months After The Date Of Delivery ]
Read MorePublish Date | 30 Jun 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 30 Jun 2025 | |
Bid Submission End Date | 25 Jul 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Tegrital Cr 200 Mg (carbamazepine) Tablet ]
Read MorePublish Date | 04 Jul 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 04 Jul 2025 | |
Bid Submission End Date | 18 Jul 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Tegrital (carbamazepine ) Cr 300 Mg Tablet ]
Read MorePublish Date | 04 Jul 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 04 Jul 2025 | |
Bid Submission End Date | 18 Jul 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Tacrolimus 0.25 Mg (pangraf 0.25 Mg) Tab/cap ]
Read MorePublish Date | 04 Jul 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 04 Jul 2025 | |
Bid Submission End Date | 18 Jul 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Set Of Base Plate
Read MorePublish Date | 05 Jul 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 05 Jul 2025 | |
Bid Submission End Date | 28 Jul 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Set Of Cab Door Assembly Lh & Rh
Read MorePublish Date | 05 Jul 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 05 Jul 2025 | |
Bid Submission End Date | 04 Aug 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Design, Supply & Installation Of Complete Furnishing Of Oscillation Monitoring System Car
Read MorePublish Date | 05 Jul 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 05 Jul 2025 | |
Bid Submission End Date | 04 Aug 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Integrated Wtcc
Read MorePublish Date | 05 Jul 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 05 Jul 2025 | |
Bid Submission End Date | 04 Aug 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Set Of Carline For Lhb Chair Car
Read MorePublish Date | 05 Jul 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 05 Jul 2025 | |
Bid Submission End Date | 04 Aug 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Set Of Channel Assembly For Lhb Ra Ac Coaches
Read MorePublish Date | 05 Jul 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 05 Jul 2025 | |
Bid Submission End Date | 15 Jul 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |