Govt. Tenders
Found 340 tenders for your search .
Supply Of Vinyl Film Colour Shade Golden Yellow As Per Isc:356 Of Is:5-2007, In Roll Siz E Of 4x150 Feet, As Per Drawing/specification: Rdso Spec. No. Rdso/2006/cg-13 Rev.1 Option-b. Film Must Be Wrapped Around Cardboard Tube. [ Warranty Period: 42 Months After The Date O F Delivery ]
Read MorePublish Date | 08 Jul 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 08 Jul 2025 | |
Bid Submission End Date | 22 Jul 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Complete Electrical Work Including Cable Laying, Loading Of Equipments, Connection And Testing In Lscn Coaches At Rcf, Kapurthala.
Read MorePublish Date | 07 Jul 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 07 Jul 2025 | |
Bid Submission End Date | 28 Jul 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Up Gradation Of Existing Underground Water Supply Pipeline In Type-ii Quarters Area By Replacing The Existing Ac Pipes In Rcf, Kapurthala.
Read MorePublish Date | 07 Jul 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 07 Jul 2025 | |
Bid Submission End Date | 30 Jul 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Annual Maintenance Contract For Repair/rewinding Of Motors And Other Electrical Equipment In Workshop Area Rcf Kapurthala.
Read MorePublish Date | 07 Jul 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 07 Jul 2025 | |
Bid Submission End Date | 08 Aug 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Insulin Aspart 100iu/ml Monocomponent Bisynthetic R-dna Insulin 3ml Cartridge And One Pen Free With Each Cartridge
Read MorePublish Date | 07 Jul 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 07 Jul 2025 | |
Bid Submission End Date | 21 Jul 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Covering For M/s Escort Emergency Pull Box
Read MorePublish Date | 07 Jul 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 07 Jul 2025 | |
Bid Submission End Date | 18 Jul 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Ac Servo Motor
Read MorePublish Date | 07 Jul 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 07 Jul 2025 | |
Bid Submission End Date | 16 Jul 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Spares Parts Required For For Maintenance Of Til Crane, Capacity 20 Ton.
Read MorePublish Date | 07 Jul 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 07 Jul 2025 | |
Bid Submission End Date | 23 Jul 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Spares For Cnc Hk Laser, Cnc Lcw Ttm & Cnc Lcw-i Balliu Machines.
Read MorePublish Date | 07 Jul 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 07 Jul 2025 | |
Bid Submission End Date | 15 Jul 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Corrigendum : Supply Of Set Of Aluminium Floor End Profile For Antyodaya Coach, As Per Drawing: Mpl Alfep Version 0, Packing Instruction: As Per Standard Packing. It Should Be Ensured That Item Should Not Rub During Transportation. The Item Should Be Packed With Adequate S Trength. Transit Damage , If Any , Shall Be At The Cost Of Supplier. [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 31 May 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 31 May 2025 | |
Bid Submission End Date | 05 Aug 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Seats For Lhb Non Ac Chair Car Coaches (108 Seater). Follow Cushioning Ma Terial Either Pu Foam To Rdso Spec. Rdso/2007/cg-04 Rev. 01 Or Silicon Foam To Rdso Spec . Rdso/2013/cg-13 Rev. 01 And Upholstery To Rdso Spec.rdso/2008/cg-07 Rev-nil With Amen Dment Slip No-5 And Corrigendum 1 Of May 2015. [ Warranty Period: 84 Months After The Date Of Delivery ]
Read MorePublish Date | 19 Jun 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 19 Jun 2025 | |
Bid Submission End Date | 25 Jul 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Floor End Profile,l=2000mm, As Per Drawing: Lw41112, Packing Instruction: As Per Standard Packing. It Should Be Ensured That Item Should Not Rub During Transportatio N. The Item Should Be Packed With Adequate Strength. Transit Damage , If Any , Shall Be At The Cost Of Supplier., Quality Plan: N.a. [ Warranty Period: 30 Months After The Date Of Delive Ry ]
Read MorePublish Date | 19 Jun 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 19 Jun 2025 | |
Bid Submission End Date | 01 Aug 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Cable Tray L=3 M, As Per Drawing: Lw44174 Alt F Item 7, Packing Instruction: Jute F Abric [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 19 Jun 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 19 Jun 2025 | |
Bid Submission End Date | 04 Aug 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Details Of Rigid Fixing Arrgt. Of Water Tank (bg), As Per Drawing: T-6-3-732 Alt L Col Iii, Packing Instruction: Pi001: Suitably Packed In Jute Bags, Quality Plan: N.a. [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 10 Jun 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 10 Jun 2025 | |
Bid Submission End Date | 30 Jul 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Corrigendum : Supply Of Bearing Bracket For Berth Cum Backrest, As Per Drawing: Se61419 (painting As Per Mdts 140, Colour Shade Ral-9006), Packing Instruction: Pi013:brown Papper Wrapping Fo R Individual Item Collectively Packed In Jute Bags [ Warranty Period: 30 Months After The Dat E Of Delivery ]
Read MorePublish Date | 10 Jun 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 10 Jun 2025 | |
Bid Submission End Date | 30 Jul 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply , Installation, Commissioning & Testing Of Stainless Steel Tubes And Double Ferrule Fittings For Lgs Coaches. Note:-installation Charges Are To Be Given/qu Oted Separately., As Per Drawing: Material Schedule As Per Set List No. Rcf/md/mat Sch/lgs , Ver 01 With Design Correction Slip No.-01 & 02 Dated 02/04/2025 & 08/04/2025 Respectively. Seperate Packing Of Furnishing And Bogie Items (furnishing Items:- Set List Items Group A , B, C & D. Bogie Items:- Set List Items Group E, F & G), Packing Instruction: No Special Packing Required. The Protruding, Threaded Portion, Gauges And Loose Items Etc. If Any Are To B E Protected With Suitable Covering To Prevent It From Damage. However Transit Damag E If Any Shall Be At The Cost Of Supplier. [ Warranty Period: 30 Months After The Date Of Delive Ry ]
Read MorePublish Date | 05 Jun 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 05 Jun 2025 | |
Bid Submission End Date | 21 Jul 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Cost Of The Concomitant Accessories According To Clause No.6.0 (6.1) Of Section-i Of Spec. Ten Derer Are Required To Attach The Price Break-up Of These Accessories In Pdf File Along With Submitted Bid. ]
Read MorePublish Date | 24 Jun 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 24 Jun 2025 | |
Bid Submission End Date | 17 Jul 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Centering Disc, As Per Drawing: 1268599 Ver.'01r' And Mdts 166 Rev. 1 Or Latest [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 08 Jul 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 08 Jul 2025 | |
Bid Submission End Date | 07 Aug 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Interior Stickers With Braille Script For Lhb Slr (31 Seater) Coaches, As Per Drawing: Lr64012 Alt B Item No 2,6 To 9,22,24 To 29,32 To 35 With Braille Script To Icf/md/sp Ec-317 Rev 00, Packing Instruction: Lettering Inside: One Complete Set Of Lettering Inside Sh Ould Be Packed In Cardboard Box. Different Subsets Should Be Made & A List Of Items Sh Ould Be Pasted On Each Packet Of Subsets. Letters Packed In Each Subset Under Different Headings Are As Under:- Plumbing : Emergency Flush Button, Press For Flush, Notice For Bio Toilet Moulding:- Duties Of Coach Attendant, Push, Pull, No Smoking, Alar M And Penalty Notice, Door Closes Automatically, Safety Message Near Gate, Notice For Luggage Capacity. Lavatory:- Dust Bin, Fire Extinguisher, Soap Dispenser, No Drinking Wa Ter, No Waste Into Toilet, Western Style, Press For Flush, Fire Prevention And Safety, M Arking Of Lavatories / Body Side Door, Notice For Lavatories, Drinking Water, Unified No Tice For Fire Prevention & Safety. Seat & Berth:- Sticker For Seat Number, Berth Numbers , Letter For Chaining Luggage, Notice For Unreserved Coaches. Air Brake:- Reset Emerge Ncy Brake, Feed Pipe, Brake Pipe, Closed, Open, Hand Brake Panel : Furnish Plate, Complain T Book. Window & Ceiling: Pull Window Glass Inside, Indication Plate & Sticker For Emerg Ency Window, Emergency Openable Window. Note : Firms Have Option To Provide Qr Code The Cardboard Box Shall Carry A Qr Code Having Details As Listed Below : " Name Of The Manufacturer " Unique Serial Number (or Lot Number For Bulk Items) Of The Manufacturer
Publish Date
07 Jul 2025
Bid Submission End Date
Earnest Amount
Refer Doc
Tender Amount
Refer Doc
Publish Date | 07 Jul 2025 | |
Bid Submission End Date | 17 Jul 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Set Of Frp Ceiling Sheet Assemblies For Lhb Chair Car, As Per Drawing: Mplcesl Jsczac Version 2 [ Warranty Period: 84 Months After The Date Of Delivery ]
Read MorePublish Date | 07 Jul 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 07 Jul 2025 | |
Bid Submission End Date | 17 Jul 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Voglibose 0.3 Mg Tablet ]
Read MorePublish Date | 07 Jul 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 07 Jul 2025 | |
Bid Submission End Date | 22 Jul 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Set Of Frp Ceiling Panels For Lhb Gs Coaches. Follow Colour Shade As Per L. No. Md46271 Dated 18.01.2021., As Per Drawing: Mplrcgs Version 0. [ Warranty Period: 84 Mo Nths After The Date Of Delivery ]
Read MorePublish Date | 08 Jul 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 08 Jul 2025 | |
Bid Submission End Date | 23 Jul 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Set Of Aluminium Floor End Profile For Antyodaya Coach, As Per Drawing: Mpl Alfep Version 0, Packing Instruction: As Per Standard Packing. It Should Be Ensured That Item Should Not Rub During Transportation. The Item Should Be Packed With Adequate S Trength. Transit Damage , If Any , Shall Be At The Cost Of Supplier. [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 08 Jul 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 08 Jul 2025 | |
Bid Submission End Date | 05 Aug 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Closed Circuit Television (cctv) Surveillance System For Lhb Coaches. Set C Onsists Of 04 Cameras Including Antena, Nvr And Panic Button. Note: Safety Clause Must Be Followed According To Annexure-a Of Dy.cple-ii L.no.rcf/emp/1 Dated. 01.04.2025, As Pe R Drawing: Rdso/spn/tc/106/2025 Version 3.1 And Follow Design L. No. Md46291 Dated 03/07/ 2025., Packing Instruction: As Per Standard Packing. It Should Be Ensured That Item Should Not Rub During Transportation. The Item Should Be Packed With Adequate Strength. Tra Nsit Damage , If Any , Shall Be At The Cost Of Supplier. [ Warranty Period: 42 Months After Th E Date Of Delivery ]
Read MorePublish Date | 09 Jul 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 09 Jul 2025 | |
Bid Submission End Date | 31 Jul 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Hydraulic Valve Part No. Dg4v-3s-6b-m-u-h5-60. Make- Vickers Or Equivalent In Mo Unting & Function. [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 09 Jul 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 09 Jul 2025 | |
Bid Submission End Date | 25 Jul 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |