Govt. Tenders
Found 1735 tenders for your search .
Supply Of Paint Enamel Smoke Grey
Read MorePublish Date | 31 Jan 2025 | |
Bid Submission End Date | 24 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 31 Jan 2025 | |
Bid Submission End Date | 24 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Locking Bracket For Angle Cock.
Read MorePublish Date | 31 Jan 2025 | |
Bid Submission End Date | 24 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 31 Jan 2025 | |
Bid Submission End Date | 24 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Sunvisor Sheet Assembly To Use On Modified Sunvisor Assembly On 25kv Ac Electric Locos To Ref.nos. 2,5 To8, 27 & 28 As Per Clw Drg.no.05/1/35/149, Alt-7 With Latest Alteration If Any.
Read MorePublish Date | 31 Jan 2025 | |
Bid Submission End Date | 24 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 31 Jan 2025 | |
Bid Submission End Date | 24 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Brake Head Bolt As Per Clw Drg No.01/4/19/64, Alt-13 Or Latest Along With Castle Nut M 36 To Is:2232, P-8.note: Clw Approved Sources Shall Only Participate In The Tender Or Supplier Offers Shall Be Considered With Valid Tender Specific Authorisation Certificate From Clw Source Shall Be Submitted Along With Their Offer.
Read MorePublish Date | 31 Jan 2025 | |
Bid Submission End Date | 24 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 31 Jan 2025 | |
Bid Submission End Date | 24 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Push Rod For Bmbs Suitable To The "knorr Design"
Read MorePublish Date | 31 Jan 2025 | |
Bid Submission End Date | 25 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 31 Jan 2025 | |
Bid Submission End Date | 25 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Rubber Door Stopper For Body Side Door.
Read MorePublish Date | 31 Jan 2025 | |
Bid Submission End Date | 04 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 31 Jan 2025 | |
Bid Submission End Date | 04 Mar 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Annual Maintenance Charges For Westrace Vlm6 Electronic Interlocking At Krishna Canal Jn.
Read MorePublish Date | 01 Feb 2025 | |
Bid Submission End Date | 24 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 01 Feb 2025 | |
Bid Submission End Date | 24 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Repair, Rewinding, Reconditioning Of 5400 Kva Loco Main Transformer (copper Winding) Of B.g. Electric Locomotives For A Period Of Two (02) Years At Locomotive Shed, Guntakal
Read MorePublish Date | 01 Feb 2025 | |
Bid Submission End Date | 24 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 01 Feb 2025 | |
Bid Submission End Date | 24 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Carrying Out Repairs To Telecom Maintenance Assets Of Vijayawada Division For Period Of One Year.
Read MorePublish Date | 01 Feb 2025 | |
Bid Submission End Date | 25 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 01 Feb 2025 | |
Bid Submission End Date | 25 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Corrugated Hose Coflex To Drg. No. 3twd.096.072 Alt 4 Or Latest If Any.note: One Sample Should Be Got Approved Before Effecting Bulk Supply.
Read MorePublish Date | 01 Feb 2025 | |
Bid Submission End Date | 24 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 01 Feb 2025 | |
Bid Submission End Date | 24 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Inter Vehicular Coupler Set
Read MorePublish Date | 01 Feb 2025 | |
Bid Submission End Date | 24 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 01 Feb 2025 | |
Bid Submission End Date | 24 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Air Brake Hose Coupling Assembly
Read MorePublish Date | 01 Feb 2025 | |
Bid Submission End Date | 24 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 01 Feb 2025 | |
Bid Submission End Date | 24 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Coil Assembly With Din Plug For E-70 Brake System As Per Ftrtipl Part No.013104500
Read MorePublish Date | 01 Feb 2025 | |
Bid Submission End Date | 27 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 01 Feb 2025 | |
Bid Submission End Date | 27 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Cylindrical Roller Bearing
Read MorePublish Date | 01 Feb 2025 | |
Bid Submission End Date | 27 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 01 Feb 2025 | |
Bid Submission End Date | 27 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Steel Dustbin Door
Read MorePublish Date | 01 Feb 2025 | |
Bid Submission End Date | 27 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 01 Feb 2025 | |
Bid Submission End Date | 27 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Steel Dustbin Door
Read MorePublish Date | 01 Feb 2025 | |
Bid Submission End Date | 28 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 01 Feb 2025 | |
Bid Submission End Date | 28 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Hyderabad Division: (1) Renovation Of Pcme Chamber, Conference Hall, Officers And Staff Toilets And Entrance Portico Of Pcme Office, 1st Floor, 'b' Block, Rail Nilayam, (2) Augmentation Of Training Facilities At Zceti/north Lallaguda Phase-ii Works & (3) Construction Of Double Store Building For Unit Dry & Wet Canteen With Store Rooms At 7th Battalion/rpsf/moula-ali/hyderabad (4) Kacheguda - Telecom Arramgements In Connection With The Work " Installation And Commissioning Of Cnc Under Floor Wheel Lathe At Kacheguda.- Telecom Arrangements.
Read MorePublish Date | 28 Jan 2025 | |
Bid Submission End Date | 24 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 28 Jan 2025 | |
Bid Submission End Date | 24 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Gnt Division -trr(p), Tbr(main Line), Tbr(loop Line), Ttr, Tfr, Glued Joints, Switch Expansion Joints, Tsr(p), Trr(s) Works - Electrical Trd Arrangements.
Read MorePublish Date | 28 Jan 2025 | |
Bid Submission End Date | 27 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 28 Jan 2025 | |
Bid Submission End Date | 27 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Gnt Division -replacement Of Existing Steel Girders With Psc Slabs For 35 Bridges - Modifications To Ohe
Read MorePublish Date | 28 Jan 2025 | |
Bid Submission End Date | 27 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 28 Jan 2025 | |
Bid Submission End Date | 27 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Gnt Division- Proposed Construction Of Foot Over Bridge At Gnt, Nlda, Nrt, Mrga, Pgrl,mrk & Ndl Stations Under Amrit Bharat Scheme - Ohe Modification Arrangements.
Read MorePublish Date | 28 Jan 2025 | |
Bid Submission End Date | 27 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 28 Jan 2025 | |
Bid Submission End Date | 27 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Amalgamated Pre-cooling Transformer Cum Rectifier Unit (battery Charger) 200a, 130v, Dc For Sg Ac Coaches With Stainless Steel Enclosure For Charging Vrla Batteries Confirming To Rcf Sp Ec. No. Edts.041 (rev.b) With Icf Amendment No.1, 2 & 3 And Amended As Per Dy.cee/ds Note No. M D/dss/spec/211 Dt.11.09.2001. However, The Firms May Quote For Latest Specn./drawing With Amendm Ent If Any Issued By Rdso/icf/rcf. [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 28 Jan 2025 | |
Bid Submission End Date | 24 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 28 Jan 2025 | |
Bid Submission End Date | 24 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Body Side Stanchion (length-500mm) To Drg.no-scr/c&w/sk-1239 & Pr Ovision Of Outer Holes For Stanchion From Centre Line Of Stanchion As Per Drg.no. Ryps /scr/c&w/sk- 1019 ( (ref. Drg No.wd-09034-s-17) And Confirming To Rdso Specification Wd- 01-crf- 12 (rev-1) Of Jan-2016. [ Warranty Period: 36 Months After The Date Of Delivery ]
Read MorePublish Date | 28 Jan 2025 | |
Bid Submission End Date | 24 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 28 Jan 2025 | |
Bid Submission End Date | 24 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of, Bell Crank Lever Rh For Bmbs Suitable To The "knorr Design" Confo Rming To Rdso Spec No. Wd-23-bmbs-2008, Rev. 1 , Amendment No. 1 Of September 2016 To Rd So Drg.no-wd-08093-s-02, Item : 5, Alt-3. [ Warranty Period: 36 Months After The Date Of Deliver Y ]
Read MorePublish Date | 28 Jan 2025 | |
Bid Submission End Date | 24 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 28 Jan 2025 | |
Bid Submission End Date | 24 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Penetrant System Consisting Of The Following 3 Items Conforming To Rdso Spec .no. M&c/ndt/105/2001 & Packing In Aerosol Can - Capacity 330 Ml Volume Qty. In Cans. 1. Penetrant - 1 Can.(type - Ii Visible Dye); 2. Cleaner - 3 Cans.(method C - Solvent Removable); 3. Developer - 2 Cans. (form D-non Aqueous & Class 2 - Non Halogenated)(shelf Life Two Years) (note : Description Vetted For C&w Workshops & Depots Requirement Only.) [ Warranty Period: 30 Months After The Date Of Deliver Y ]
Read MorePublish Date | 28 Jan 2025 | |
Bid Submission End Date | 24 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 28 Jan 2025 | |
Bid Submission End Date | 24 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Energy Saver For Air Conditioning Units For 2t Capacity Having Memory Based Micro Controller, With Dual Sensor & Display For R Oom And Coil Temperature, Measures Room/coil/ambient Temperatures- Features A 10-pt Programmable Menu And A Remote To Change Your S Et Temperature, Which Constantly Analyses The Temperature Transfer Profiles Between The Air And Evaporator Coil. Accepted Make: Airtron Or Equivalent [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 28 Jan 2025 | |
Bid Submission End Date | 27 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 28 Jan 2025 | |
Bid Submission End Date | 27 Feb 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |