- Splitting
- Advisory Bank
- Reserved for MII
- Reserved for MSE
- Bid to RA Enabled
- Evaluation Method
- MSE Purchase Preference
- MSE Exemption
Splitting
Advisory Bank
Reserved for MII
Reserved for MSE
Bid to RA Enabled
Evaluation Method
MSE Purchase Preference
MSE Exemption
Showing 1875 to 1900 of 2,138 results.
South Central Railway
Supply Of Electro Valve Assembly Complete For E.p. Contactor As Per Clw Drawing No.4twd.111.1 18, Alt-14 (sheet No.0) And Clw Spec. No.4tes.111.018.alt-3 [ Warranty Period: 30 Months After Th E Date Of Delivery ]
South Central Railway
Helical Spring For Axle Box Guide Arrangement Of Vvn-h1 To Icf Drg No.- Dc/emu/m2-0-1-203, Alt.-p/4, Ite M No.- 1 & Confirming To Rdso Spec. No.wd-01-hls-1994 {rev.4 Of January 2022} Read To All Amnd.with Latest Amn D. Slip No.-4 Of October-2020. Warranty Period : 60 Months From The Date Of Supply. [ Warranty Period: 60 Months Aft Er The Date Of Delivery ]
South Central Railway
Supply And Commissioning Of Battery Operated Platform Truck- 3t Capacity As Per Technical Specification Attached As Annexure_a, Make - Josts Or Equivalent Meeting The Tender Specification. [ Warranty Period: 30 Months Af Ter The Date Of Delivery ]
South Central Railway
Supply Of Safety Loop Complete For Uncoupling Rod In Assembled Condition ( Item 3 An D 4 Duly Fitted To Item 1 & 2) To Rdso Drg No : Wd-03002-s-01 Items: 1 To 4, Alt : 1. [ Warran Ty Period: 30 Months After The Date Of Delivery ]
South Central Railway
Supply Of Horizontal Damper For Vb Train Set To M/s. Itt Koni Drg.no. Off 16729, Rev.b Or Zf Drg.no.40130000447 2- Item To Be As Per M/s. Ec Engineering Specification No Mt18br2001466-05 [ Warranty Period: 30 Months After The D Ate Of Delivery ]
South Central Railway
Supply Of Male Connector 16 X 20 - 1/2 Inch To Rcf Drg No. Le63222, Alt.-b/nil [ Warranty Period: 30 Months After The Date Of Delivery ]
South Central Railway
Supply Of Articulated Lock Lift Lever Assly. Conforming To Rdso Str No.- Wd-70-bd-10 ( Rev-4) To Rdso Drg No : Sk - 62724, Items : 5,6,7,16 & 17, Alt : 31. [ Warranty Period: 72 Month S After The Date Of Delivery ]
South Central Railway
Supply Of Bow Shackle 50 Ton Capacity Having Specifications As Per Attached Annexure A [ Warranty Period: 30 Months After The Date Of Delivery ]
South Central Railway
Supply Of Inside Number Plate Bracket For Ac Coaches As Per Drg.no. Sk No.1247/c, Item No-02 [ Warranty Period: 12 Months After The Date Of Delivery ]
South Central Railway
Supply Of Armature Assembly, Less Bearing (wound) To Bhel Drg. No. 04394080002v00. [ Warra Nty Period: 30 Months After The Date Of Delivery ]
South Central Railway
Supply, Installation And Commissioning Of Dg Set, 7.5 Kva, 3 Phase, 415 Volts, 10.4 Amp, 50hz, 1500 Rp M, Air Cooled Diesel Engine. Suitable For Lifting Platform Of 8 Wheeler Tower Wagon. Make-kirlosker, Honda, Eicher With Remote Sencering System Or Equivalent/similar. [ Warranty Period: 24 Months After The Date Of Delivery ]
South Central Railway
Outsourcing Of Linen Distribution Work For Air-conditioning Coaches Of Train No. 12715/16, 17611/12, 17614/13 & 17630/29 For A Period Of One Year.
South Central Railway
Sc Division: Replacement Of Failure Prone Nicco Make Contact Wire In Kzj-wd Section.
South Central Railway
Annual Maintenance Contract For Service Assistance Of Plasser Make Track Machines For Two Years I.e., 2025-26 & 2026-27 For An Amount Of Rs. 55,78,775 /- (rs. 25,53,270/- For The Year 2025-26 & Rs. 30,25,505 /- For The Year 2026-27 ) For Dy.ce/tm/lines/bza Only.
South Central Railway
Bza Division : Bza-vskp Section: Cleaning Of Tracks Including Cess/slopes Etc., On Either Side Along The Track Running Meters By Removing/picking Up Of Muck, Garbage, Plastic & Paper Waste Strewn And Other Materials In Aden/rjy, Slo & Tuni Sub Divisions In Sr.den/north/bza Jurisdiction For A Period Of 2 Years.
South Central Railway
Repair/rewinding Of 5 Nos Wap7 (7475/7775 Kva) Traction Transformer Of 3phase Locomotives.
South Central Railway
Sc Division: Replacement Of Composite Insulators With Porcelain Insulators In Connection With Safety Over Sc Division.
South Central Railway
Sc Division: Replacement Of Over-aged Insulators And Rusted Cantilevers Over Sc Division.
South Central Railway
Vijayawada Division: Signal And Telecom Department: S&t Works In Connection With 1. Provision Of Electronic Interlocking At Gullipadu(glu) Station Between Samalkot (slo)-visakhapatnam(vskp) Section On High Density Network Routes Of Vijayawada Division. 2.gullipadu (bza-vskp Section): Proposal For Provision Of Standard Layout On Double Line, With Addl. Loop Line On Down Side.
South Central Railway
Supply, Installation And Commissioning Of Electro Hydraulic Orthopedic Operat Ion Table As Per Attached Specification ]
South Central Railway
Supply Of On Line Filterations Monitoring Unit. Make: Plasser, Rexroth, Hydac Or Its Equivalent. ]
South Central Railway
Supply Of Emergency Pump As Per Harsco Part No. 0-3310001-0-00, Make - Harsco Imported. ]
South Central Railway
Supply Of Satellite Axle Gearbox Assy., As Per Plasser Part No. Ud62.3900.i Make: Plasser Omc Or Its Eq Uivalent Indian Make/brand [as Per Annexure Iiib , S.no.704 ]
South Central Railway
Supply Of Primary Metal Bump Stop Height Measuring Gauge As Per Rdso Drawing No Rdso/cg/drg/25001 [ Warranty Period: 30 Months After The Date Of Delivery ]
South Central Railway
Supply Of Set Of Modified Spring Pads For Vande Bharat Bogies Consisting Of 02 Items . 1. Primary Suspension Rubbe R Pad For Vande Bharat Bogie As Per The Drawing No.mt18br2001451-3, Rev-nil And With Reference To Medhas Part No. S Pmaet18bogie1013- 01 No Per Set . 2. Spring Pad Bottom Monobloc_a675uv2 For Vande Bharat Bogie As Per Drawing No. D-a675uv2-181310, Rev-03 And With Reference To Medhas Part No. Spmaet18bogie1122- 01 No Per Set. [ Warrant Y Period: 30 Months After The Date Of Delivery ]