Govt. Tenders
Found 1668 tenders for your search .
Heavy Duty Bldc Air Circulator Fan 600mm Sweep (24inch), Speed 1300+/- 5% Rpm, Wall Mounti Ng Type. Three Speed Type And Suitable To Work On 160 To 270 V, 50 Hz, Ac Supply. Air Delivery Minimum Of 270 Cubic Meter Per Minute , Maximum Power: 140 W, Conforming To Is-2997/1994 Or Latest, With 30 Months Minim Um Warranty. Make: Arizon, Brayan, Greenberg, Atomberg, Crompton, Orient, Usha, Havells. [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 27 May 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 27 May 2025 | |
Bid Submission End Date | 10 Jun 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Pivot Liner Vertical Half To Clw Drg. No. 03/4/12/2 Alteration-4. Material Conforming To R Dso Specn No. Mp-0-40-00-02 Revision-00) June 2007 [ Warranty Period: 30 Months After The Date O F Delivery ]
Read MorePublish Date | 27 May 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 27 May 2025 | |
Bid Submission End Date | 10 Jun 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Portable Welding Generator Set (100/200a) With Accessories, Engine - Petrol Start - Petrol Run , Power -13 Hp, Air Cooled, No. Of Cylinder - 1, Transistorized Magneto Ignition With Recoil / Electric Start Syst Em, Generator 4.5k W, Single Phase 230v Ac Alternator With Welding Current Range 50a - 200 A And Electro De Dia. 5mm Make - Honda Engine With Honda Generator Model Shw 190 Or Similar [ Warranty Period: 3 0 Months After The Date Of Delivery ]
Read MorePublish Date | 27 May 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 27 May 2025 | |
Bid Submission End Date | 24 Jun 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Radiator For Phooltas Make 4 Wheeler Tower Car Of Model Nt855r Part No. Ohe4-02 Std/08. [ Warranty Period: 30 Months After The Date Of De Livery ]
Read MorePublish Date | 27 May 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 27 May 2025 | |
Bid Submission End Date | 17 Jun 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Sinewave Inverter 10 Kva 110 V Dc / 230 V Ac Single Phase 50 Hz, Confirming To Icf Specific Ation No. Icf/elec/909, Rev. A. Makes Hirel And Signotron Only Accepted. [ Warranty Period: 30 Mont Hs After The Date Of Delivery ]
Read MorePublish Date | 27 May 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 27 May 2025 | |
Bid Submission End Date | 17 Jun 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of C2w Relay Valve With Bracket Having 3/4" Bsp Hole For Port No. 1 & 3 With 6mm Choke I N Exhaust To Wabco Part. No. 579991, Sil Part. No. 30301723 Or To Ftil Part. No. 505001300 And Conf Irming To Wabco Test Spec No. T-3439-0. [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 27 May 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 27 May 2025 | |
Bid Submission End Date | 16 Jun 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Smps Based Ips System, Confirming To Rdso Spec.no.rdso/spn/165/2012 - Versio N3.0, Std Re002 Ips Scheme For 4 Lines As Per The Drawing Enclosed. [sdo/ips/pi-4l/re/002 ]
Read MorePublish Date | 27 May 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 27 May 2025 | |
Bid Submission End Date | 24 Jun 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Safety Equipments. As Per The 16 Items Enclosed [ Warranty Period: 30 Months After The D Ate Of Delivery ]
Read MorePublish Date | 27 May 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 27 May 2025 | |
Bid Submission End Date | 23 Jun 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply And Installation Of Door For Dynamic Balancing Machine As Per Drg.no: Trs/acl/sk/26 3. Note: Door To Be Fabricated As Per The Mentioned Note In The Drawing Only. ]
Read MorePublish Date | 27 May 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 27 May 2025 | |
Bid Submission End Date | 18 Jun 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Heaxagonal Head Screw M8 X 25 Grade 8.8 As Per Is: 1364/pt - 2/1992 With 01 No Of M8 Nut As Per Is: 1364/pt - 3/1992, 01 No Spring Washer As Per Is: 3063/72 Type B, & 01 No Plain W Asher As Per Is: 2016/67 Make:tvs/dfl/gkw/pfl/unbrako. [ Warranty Period: 30 Months After The Da Te Of Delivery ]
Read MorePublish Date | 27 May 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 27 May 2025 | |
Bid Submission End Date | 18 Jun 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Deburring Brush Of Armature Commutator Mica Under Cutting For Hyt Mica Und Er Cutting Machine As Per Drg.no.3tms/cnb/drg/2005/a Alt-1. [deburring & Polishing Wheel (standa Rd Type) For Tm Armature With Standard Wire Dia. Abrasive Nylon Bristles Coated With Silicon Carbide; Od-2 00mm, Thick-20mm, Bore-35mm X Pcd 49.5 X 7mm, 04 Screw Holes For Holding With Spindle Of Deburring Wheel. ]
Read MorePublish Date | 27 May 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 27 May 2025 | |
Bid Submission End Date | 18 Jun 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Modified Steel Wire Rope Sling Of 15 Swl Capacity To Drg No.dme/dsl/ed-m-666. Note : Test Certificatae To Proof Load (twice Swl) Should Be Furnished From A Govt Approved Test House. [ Warranty P Eriod: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 27 May 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 27 May 2025 | |
Bid Submission End Date | 18 Jun 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Set Of Insulating Shim For Motor Contactor As Per Clw Drawing No. 3twd.112.041a, Alt-5. : ( 1). Item No. 8 Shim Thickness 16.5mm-1000 Nos/set (2). Item No. 9 Shim Thickness 1mm-1000 Nos/set (3) It Em No. 12 Shim Thickness 0.5mm-1000 Nos/set. [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 27 May 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 27 May 2025 | |
Bid Submission End Date | 18 Jun 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Contactor For Head Light, Auxiliaries Compressor And Gusp (pos No. 48.2, 338, 218.2) And A Uxiliary Contactor For Contactor Auxalries (pos No. 52.3, 52.6), Type S-163 As Per Clw Specification No. Clw /es/3/0034 Alt.-c [abb Document No. Hbtb585402 R0821.note:this Item Should Be Supplied By Clw Approved Source Or Authorized Delear Only. [ Warranty Period: 30 Months After The Date Of Deliv Ery ]
Read MorePublish Date | 27 May 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 27 May 2025 | |
Bid Submission End Date | 18 Jun 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Gauge For Checking The Combined Wear Of Bolster, Side Frame Liner & Wedge, Casnub - 22w, 22 W (m), 22nl, 22nlb & Hs Bogies. As Per Drawing Attached. All Gauges Must Be Calibrated And One Year Separat E Calibration Certificates Of Each Gauge Required With The Material [ Warranty Period: 12 Months After The Date Of Delivery ]
Read MorePublish Date | 27 May 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 27 May 2025 | |
Bid Submission End Date | 12 Jun 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Direct On Line (dol) Type Pump Controller /starter Panel Suitable For 3 Hp Three Phase Submersibl E Pump With Supply Voltage 415 V, 50 Hz . The Said Starter Panel Should Have Voltmeter, Ammeter, Thermal Over Load Relay, Single Phase Preventer , Dry Run Protection, On/off Push Button Switch, Led Indication, Terminal For Wlc . Makes: L&t (model No.mug10w Dol), Bch, C&s, Abb, Siemens, Havells, Crompton. [ Warranty Period: 12 Months After The Date Of Delivery ]
Read MorePublish Date | 27 May 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 27 May 2025 | |
Bid Submission End Date | 12 Jun 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Aoh Replacement Kit For 22 Cb Loco Vcb, Make-schneider, Part Code - Mfr38245. [ Warr Anty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 27 May 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 27 May 2025 | |
Bid Submission End Date | 13 Jun 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Wheel For Inspection ( Push ) Trolley To Drg.no.ews.sk-1087 [ Warranty Period: 30 Months After The Date Of Delivery ]
Read MorePublish Date | 27 May 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 27 May 2025 | |
Bid Submission End Date | 18 Jun 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Supply Of Integrated Tissue Processor Cutter And Embedding Equipment [ Warranty Period: 3 6 Months After The Date Of Delivery ]
Read MorePublish Date | 27 May 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 27 May 2025 | |
Bid Submission End Date | 18 Jun 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
500; Plain Copier Paper V3 ISI Marked to IS 14490 Q4 MSE Exemption for Years Of Experience/ and Turnover 12 12 Yes Startup Exemption for Years Of Experience/and Turnover12 12 Yes Document required from seller/ Certificate Requested in ATCOEM Authorization Certificate In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid/ No Bid to RA enabled/ No Type of Bid/Single Packet Bid Time allowed for Technical Clarifications during technical evaluation/ 3: 3: 2 Days
Read MorePublish Date | 03 Jun 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 03 Jun 2025 | |
Bid Submission End Date | 13 Jun 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
2; Breath Alcohol Analyzers Q3 MSE Exemption for Years Of Experience/ and Turnover 12 12 Yes Startup Exemption for Years Of Experience/and Turnover12 12 Yes Document required from seller/ Certificate Requested in ATCOEM Authorization Certificate In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid/ No Bid to RA enabled/ No Type of Bid/Single Packet Bid Time allowed for Technical Clarifications during technical evaluation/ 3: 3: 2 Days
Read MorePublish Date | 03 Jun 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 03 Jun 2025 | |
Bid Submission End Date | 13 Jun 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
2; Computer Printer V2 Q2 MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Certificate Requested in ATCOEM Authorization Certificate In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid/ No Bid to RA enabled/ No Type of Bid/Single Packet Bid Time allowed for Technical Clarifications during technical evaluation/ 2 Days Inspection Required By Empanelled Inspection Authority / Agencies pre- registered with GeM No
Read MorePublish Date | 03 Jun 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 03 Jun 2025 | |
Bid Submission End Date | 16 Jun 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Monthly Basis Cab Taxi Hiring Services - SUV 2080 Km x 312 hours Outstation Contract Period/ 2 Years MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Bid to RA enabled/ No Type of Bid/Single Packet Bid Time allowed for Technical Clarifications during technical evaluation/ 3 Days Estimated Bid Value/ INR 1342200 Evaluation Method/ Total value wise evaluation Arbitration Clause No Mediation Clause No
Read MorePublish Date | 03 Jun 2025 | |
Bid Submission End Date | ||
Earnest Amount | 27 K | |
Tender Amount | Refer Doc |
Publish Date | 03 Jun 2025 | |
Bid Submission End Date | 13 Jun 2025 | |
Earnest Amount | 27 K | |
Tender Amount | Refer Doc |
Chennai Division - Provision Of Led Flood Lighting Arrangements In All 8-wheeler And 4-wheeler Tower Wagons.
Read MorePublish Date | 02 Jun 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 02 Jun 2025 | |
Bid Submission End Date | 24 Jun 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Provision Of Electronic Based Train Signal Register (etsr) At Leftover Stations Over Tpj Division.
Read MorePublish Date | 03 Jun 2025 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 03 Jun 2025 | |
Bid Submission End Date | 26 Jun 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |