- Splitting
- Advisory Bank
- Reserved for MII
- Reserved for MSE
- Bid to RA Enabled
- Evaluation Method
- MSE Purchase Preference
- MSE Exemption
Splitting
Advisory Bank
Reserved for MII
Reserved for MSE
Bid to RA Enabled
Evaluation Method
MSE Purchase Preference
MSE Exemption
Showing 3575 to 3600 of 3,819 results.
MEHSANA DISTRICT COOPERATIVE MILK PRODUCERS UNION LIMITED
Supply Of Attendance Device
MEHSANA DISTRICT COOPERATIVE MILK PRODUCERS UNION LIMITED
Supply Of Air Cooler Make-symphony/bajaj Capacity-100ltr.
MEHSANA DISTRICT COOPERATIVE MILK PRODUCERS UNION LIMITED
Service Visit Of Apv Enginner For Health Checkup Of Uht Homogeniser S3
MEHSANA DISTRICT COOPERATIVE MILK PRODUCERS UNION LIMITED
Servicing Of Floor Cleaning Machine Ct-40
MEHSANA DISTRICT COOPERATIVE MILK PRODUCERS UNION LIMITED
Supply Of Lab Testing
MEHSANA DISTRICT COOPERATIVE MILK PRODUCERS UNION LIMITED
Supply Of Hardware Item
MEHSANA DISTRICT COOPERATIVE MILK PRODUCERS UNION LIMITED
Supply Of Seal Single Mechanical Fmos Pump
MEHSANA DISTRICT COOPERATIVE MILK PRODUCERS UNION LIMITED
Water Impact Assesment Report
MEHSANA DISTRICT COOPERATIVE MILK PRODUCERS UNION LIMITED
Supply Of Silver Barak
MEHSANA DISTRICT COOPERATIVE MILK PRODUCERS UNION LIMITED
Supply Of Seeds Of Green Cardamom Without Hull
North Eastern Railway
Supply Of Check Valve 1-1/4"(mr&cp) For E70 Brake System To Ftil Part No. 002007600. [ Warranty Period: 30 Months After The Date Of Delivery ]
Northern Railway
Supply Of Fastener Kit For Socket Joint I) Lock Washer Of Dellner Part No.1040404 - 2 Nos Ii) Hex Head Screw Of Dellner Part No. 5024016171 - 4 Nos Iii) Plainwasher Of Dellner Part No. 5458170200 - 4 Nos Iv) Prevailing Torque Hex Nut Ofdellner Part No. 5374016100 - 4 Nos For Semi Permanent Coupler O F Vande Bharat Train. [ Warranty Period: 30 Months After The Date Of Delivery ]
North Eastern Railway
Supply Of Set Of Gaskets For Tmb, Mrb, Sctmb, Scmrb. Item Details As Per Annexure Attached With Me Ntioned Drawing Numbers. Each Set Consists Of 11 Items 12 Nos Only [ Warranty Period: 30 Months After T He Date Of Delivery ]
North Eastern Railway
Supply Of Hex. Head Bolt To Is: I363(part-): 2002/1so 40l6- Mi2 X S0 Mm With Hex. Nut To Is: J363 (part -3): 2002/1so 4034 Mi2 [ Warranty Period: 30 Months After The Date Of Delivery ]
Northern Railway
Supply Of Capacitor 1 Kvar As Per Rcf Drg. No. Cc 71521 Item No. 6 Suitable For Capacitor Bank Of Lh B Ac Coaches. [ Warranty Period: 30 Months After The Date Of Delivery ]
North Eastern Railway
Supply Of Set Of Cover For Axle Box Of Wag-9/wap-7 Locos Consist Of 1)cover As Per A Bb Drg. No. Ib011-00177 And Clw Drg.no. 1209-01-011-011 Alt-2, 2)cover-1 As Per Abb Drg.n O.ib011-00179 And Clw Drg.no.1209-01-011-010 Alt-2, 3)rear Cover As Per Abb Drg.no. Ib011 -00282 And Clw Drg.no.1209-01-111-012 Alt-2 .qty 02 Nos Of Each [ Warranty Period: 30 Mon Ths After The Date Of Delivery ]
North Eastern Railway
Supply Of Member As Per Rcf Drg No Le11315 Alt A Or Latest Upto The Date Of Tender Opening. Item To B E Supplied With Red Oxide Zinc Chromate Primer Coating. [ Warranty Period: 30 Months After The Date Of D Elivery ]
North Eastern Railway
Supply Of Main Door Sill Plate Of Lhb Coaches (type- Ii) Dbws Sketch No. 1523. [ Warranty Pe Riod: 30 Months After The Date Of Delivery ]
North Eastern Railway
Supply Of Set Of Driver Seat Cover With Hd Foam Of Blue Colour Superior Quality Clot H To Suit Back And Bottom Seat Of 3-phase Loco To Abb Drg. No.1a-086-00423 Cloth Specn. J Ai Cott [ Warranty Period: 30 Months After The Date Of Delivery ]
North Eastern Railway
Supply Of Auto Drain Valve To Ftrtil Part No. 010001100. [ Warranty Period: 30 Months After T He Date Of Delivery ]
North Eastern Railway
Supply Of Air Flow Relay Valve (r6)assembly For Knorr Bremse Make Air Brake Triplate Panel Of W Ag-7 Locos Kb Part No. Ii83410. [ Warranty Period: 30 Months After The Date Of Delivery ]
North Eastern Railway
Supply Of Axial Fan 41w , 110 V Ac , Single Phase, 50 Hz, 2750rpm, Air Flow 235 M3/hr, Body Made Of Die Cast Aluminium , Blades Made Of Sheet Steel/glass Filled Polycarbnate To Icf Drg. No. Icf/sk-7-6-177 Alt 'b' As Per Is: 3588. Required Makes: Hicool 17a115 Hbac Or Its Equivalent In Ebm Nadi Or Jigo. [ Warrant Y Period: 30 Months After The Date Of Delivery ]
North Eastern Railway
Supply Of Side Bearer Complete As Per Drg No 56711031 Without Item No 1 [ Warranty Period: 30 Months After The Date Of Delivery ]
North Eastern Railway
Supply Of Lavatory Door Arrangement For Disable Passanger Lavatory Of Slrd Coaches T O Drawing No. Slr 2-5-6-202 Alt.b Col-i. The Colour Shade And Pattern Of Panels Shall Be As P Er Lp Sheet Sample Code No. Nac.-spos And Material Of Panels As Per Rdso Spec.ck-513, Door F Rame Shall Be Galvanised According To Is: 1573-89 To Service Grade No.4 Instead To Red Oxid E Zinc Chromate Primer. (ventilation Grill Should Be Fitted At Bottom Of Lavatory Door). [ W Arranty Period: 30 Months After The Date Of Delivery ]
North Eastern Railway
Supply Of Bracket Complete For Lhb Coaches As Per Drg No- 3 10113. 0. 03. 095. 002 Alt R2 [ Wa Rranty Period: 30 Months After The Date Of Delivery ]