Showing 400 - 425 of 1,799
HIMACHAL PRADESH POWER TRANSMISSION CORPORATION LIMITED
One hour left
Corrigendum : Design, Engineering, Manufacturing, Fabrication, Testing At Manufacturers Works Of Equipments And Materials, Loading, At Site Of Switchgear And Associated Equipment And Associated Civil Works For 01 No. Additional 160/200mva, 220/132kv Auto-t/f Kumih
End Date
23 Mar 2026
One hour left
Location
Solan, Himachal Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
All India Institute Of Medical Sciences aiims
HUMAN ELISA KITS;174;Human anti-CCP ELISA kit , Human anti-MPO ELISA kit , Human anti-PR3 IgG ELISA kit , Human anti-dsDNA ELISA kit , Human anti-b2GPI IgG ELISA kit , Human anti-GBM IgG ELISA Kit , Human anti-cardiolipin IgG ELISA kit , Human anti-PLAR2 ELISA kit , Human metanephrine ELISA kit , Human normetanephrine ELISA kit , Human BSALP ELISA kit , Human anti-GAD65 Antibody ELISA kit , Human ZnT8 ELISA kit , Human IA2 ELISA kit , Human IAA ELISA kit , Human PRA ELISA kit , Human aldosterone ELISA kit
End Date
08 Apr 2026
16 days left
Location
Bilaspur Hp, Himachal Pradesh
Department
Department Of Health And Family Welfare
Amount
Refer doc
Amount:
Refer doc
NA
Custom Bid for Services - AMC for 10KLD Sewage Treatment Plant installed at DSHEP Office, Hamirpur
End Date
01 Apr 2026
9 days left
Location
Hamirpurhp, Himachal Pradesh
Department
Refer doc
Amount
₹ 96 K
Amount:
₹ 96 K
SJVN Limited
One hour left
Slope Stabilization Works Behind Bachelor Accommodation Building Of Dshep At Village Salasi Po Jehan Tehsil Nadaun District Hamirpur Hp
End Date
23 Mar 2026
One hour left
Location
Hamirpur(HP), Himachal Pradesh
Department
Refer doc
Amount
₹ 26.42 L
Amount:
₹ 26.42 L
DIRECTORATE OF MEDICAL EDUCATION AND RESEARCH
One hour left
Corrigendum : E-tender For The Procurement Of Anaesthesia Workstation For Department Of Anaesthesia, Igmc Shimla.
End Date
23 Mar 2026
One hour left
Location
Shimla, Himachal Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
DIRECTORATE OF MEDICAL EDUCATION AND RESEARCH
One hour left
Corrigendum : E-tender For The Procurement Of Various Equipment For Anaesthesia Department.
End Date
23 Mar 2026
One hour left
Location
Shimla, Himachal Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
BHAKRA BEAS MANAGEMENT BOARD
One hour left
Corrigendum : Providing And Laying Patch Work With Close-graded Premix Surfacing Material Of 20 Mm Thickness From Barmala Barrier To Olinda D/board - Providing and laying patch work with close-graded premix surfacing material of 20 mm thickness from Barmala Barrier to Olinda D/Board ( Annual Maintenance & Repair to Tarred Roads from Nangal to Bhakra including link roads, removing slips and maintenance of Drains of Bhakra Dam area for the year 2024-25 )
End Date
23 Mar 2026
One hour left
Location
Bilaspur (HP), Himachal Pradesh
Department
Refer doc
Amount
₹ 6.59 L
Amount:
₹ 6.59 L
SJVN Limited
2 days left
Construction Of New Retaining Wall After Demolishing Existing Protruding Retaining Wall Near Operation And Maintenance Store Njhps Dam Operation And Maintenance Nathpa Distt Kinnaur
End Date
25 Mar 2026
2 days left
Location
JHAKRI, Himachal Pradesh
Department
Refer doc
Amount
₹ 34.15 L
Amount:
₹ 34.15 L
SJVN Limited
2 days left
Painting Work On Ventilation Ducts Of Njhps Power House Complex.
End Date
25 Mar 2026
2 days left
Location
JHAKRI, Himachal Pradesh
Department
Refer doc
Amount
₹ 3.54 K
Amount:
₹ 3.54 K
PRADHAN MANTRI GRAM SADAK YOJANA
Formation Cutting ,c/o Passing Places, Breast Wall Retaining Wall, Gabion Wall, Missing Cd, Road Side Drain, Parapets, Crash Barrier , Road Sign Board , Cell Filled Cement Concrete Pavement - Construction of Link road to village Bamot Km 0/000 to 1/500 in District Shimla (HP) Under PMGSY-IV Batch-I. Package No. HP-09-780. Sub Head :- Formation Cutting, C/o Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing CD, Road Side Drain, Parapets, Road Sign Board and Cell Filled Cement concrete Pavement.
End Date
27 Mar 2026
4 days left
Location
Shimla, Himachal Pradesh
Department
Refer doc
Amount
₹ 1.62 Cr
Amount:
₹ 1.62 Cr
PRADHAN MANTRI GRAM SADAK YOJANA
Formation Cutting, Construction of Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing Cd, Road Side Drain, Parapets , Crash Barrier, Road Sign Board, Bio Engineering Works, Cell Filled Cement Concrete Pavement And Tarring Work Etc. - Construction of Baldeyan to Manar road Km 2/000 to 12/385 in District Shimla (HP) Under PMGSY-IV Batch-I. Package No. HP-09-775. (SH :- Formation Cutting, C/o Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing CD, Road Side Drain, Parapets, Crash Barrier, Road Sign Board, Bio Engineering Works, Cell Filled Cement concrete Pavement and Tarring work etc.
End Date
27 Mar 2026
4 days left
Location
Shimla, Himachal Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
PRADHAN MANTRI GRAM SADAK YOJANA
Formation Cutting ,c/o Passing Places, Breast Wall Retaining Wall, Gabion Wall, Missing Cd, Road Side Drain, Parapets, Crash Barrier , Road Sign Board , Bio Engineering Works ,paver Blocks And Tarring Work Etc. - Construction of Kanola to Chabalri road Km 0/000 to 4/200 in District Shimla (HP) Under PMGSY-IV Batch-I. Package No. HP-09-777. (SH:- Formation Cutting, C/o Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing CD, Road Side Drain, Parapets, Crash Barrier, Road Sign Board, Bio Engineering Works, Paver Blocks and Tarring work etc).
End Date
27 Mar 2026
4 days left
Location
Shimla, Himachal Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
PRADHAN MANTRI GRAM SADAK YOJANA
Formation Cutting ,c/o Passing Places, Breast Wall Retaining Wall, Gabion Wall, Missing Cd, Road Side Drain, Parapets, Crash Barrier , Road Sign Board , Bio Engineering Works ,paver Blocks And Tarring Work Etc - Construction of Dhalli to Dhar road Km 0/000 to 1/600 in District Shimla (HP) Under PMGSY-IV Batch-I. Package No. HP-09-778. (SH:- Formation Cutting, C/o Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing CD, Road Side Drain, Parapets, Road Sign Board, Bio Engineering Works and Tarring work etc.
End Date
27 Mar 2026
4 days left
Location
Shimla, Himachal Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
PRADHAN MANTRI GRAM SADAK YOJANA
Formation Cutting ,c/o Passing Places, Breast Wall Retaining Wall, Gabion Wall, Missing Cd, Road Side Drain, Parapets, Crash Barrier , Road Sign Board , Bio Engineering Works And Tarring Work Etc. - Construction of Darun to Jubbar road Km 0/000 to 3/600 in District Shimla (HP) Under PMGSY-IV Batch-I. Package No. HP-09-776.(SH:- Formation Cutting, C/o Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing CD, Road Side Drain, Parapets, Crash Barrier, Road Sign Board, Bio Engineering Works and Tarring work etc.
End Date
27 Mar 2026
4 days left
Location
Shimla, Himachal Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
PRADHAN MANTRI GRAM SADAK YOJANA
Formation Cutting ,c/o Passing Places, Breast Wall Retaining Wall, Gabion Wall, Missing Cd, Road Side Drain, Parapets, Crash Barrier , Road Sign Board , Bio Engineering Works ,paver Blocks And Tarring Work Etc. - Construction of Chewla Tapog road Km 0/000 to 8/700 in District Shimla (HP) Under PMGSY-IV Batch-I. Package No. HP-09-779. Sub Head :- Formation Cutting, C/o Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing CD, Road Side Drain, Parapets, Crash Barrier, Road Sign Board, Bio Engineering Works, Paver Blocks and Tarring work etc.
End Date
28 Mar 2026
5 days left
Location
Shimla, Himachal Pradesh
Department
Refer doc
Amount
₹ 8 Cr
Amount:
₹ 8 Cr
PRADHAN MANTRI GRAM SADAK YOJANA
Constrction Link Road Sapru To Guard Hatt Haripur Via Kora Garna Km 0.0 To 4.00 Package No Hp04 03 Under Pmgsy -iv Batch -1 Of 2025-26 - Construction of Link road from Bankhandi Kherian road to Bagrotian Da Behra Village Amlehar Km 0/000 to 1/600 (Package No HP-04-01) under PMGSY-IV (Batch-I, 2025-26) in Distt Kangra (H.P.) (Sub Head:- Formation Cutting, C/o Passing Places, Side Drain, Parapets, Cross drainage, Cell filled CC Pavement, Metalling & Tarring work etcetra including five year routine maintenance)
End Date
30 Mar 2026
7 days left
Location
Kangra, Himachal Pradesh
Department
Refer doc
Amount
₹ 4.62 Cr
Amount:
₹ 4.62 Cr
PRADHAN MANTRI GRAM SADAK YOJANA
Rofd, Protection Work, X-drainage Works, M/t Road Side Drain, Crash Barrier, Road Furniture And Dumping Structure In Km 0/00 To 7/500 I/c Five Years Routine Maintenance) Under Pmgsy-iv - Upgradation of Chapandli to chilla road km 0.000 to 7.500 in District Shimla (HP) Under PMGSY-IV Batch-I. Package No. HP-09-825 (SH: ROFD, CD work , Retaining wall, Gabion Wall, Mettaling and Tarring, Panelled Cement Pavement , Drain ,Parapets, Crash Barrier, Road Safety Measure)
End Date
30 Mar 2026
7 days left
Location
Shimla, Himachal Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
PRADHAN MANTRI GRAM SADAK YOJANA
Formation Cutting ,construction Of Passing Places ,side Drain, Parapets, Cross Drainage, Sell Filled Cc Pavement, Metalling And Tarring Work Exctra Including Five Year Routeen Maintenance - Construction of Thatar to Ghatot Via Dharmman road Km 0/00 to 1/500 ( Package No HP-04-359 ) Under PMGSY-IV ( Batch-I, 2025-26) in Distt Kangra (HP) (SH: Formation cutting ,construction of passing places ,side drain, parapets, cross drainage, sell filled Cc pavement, metalling and tarring work exctra including five year routeen maintenance)
End Date
30 Mar 2026
7 days left
Location
Kangra, Himachal Pradesh
Department
Refer doc
Amount
₹ 2.5 Cr
Amount:
₹ 2.5 Cr
PRADHAN MANTRI GRAM SADAK YOJANA
Rofd, Protection Work, X-drainage Works, M/t Road Side Drain, Crash Barrier, Road Furniture And Dumping Structure In Km 0/00 To 11/000 I/c Five Years Routine Maintenance) Under Pmgsy-iv - Construction of Road from Thiara to Poria 0/00 to 11/000 in District Shimla (HP) Under PMGSY-IV Batch-I. Package No. HP-09-807. (SH: Formation Cutting, C/o Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing CD, Road Side Drain, Parapets, Crash Barrier, Road Sign Board, Bio Engineering Works, Cell Filled Cement concrete Pavement and Tarring work etc.
End Date
30 Mar 2026
7 days left
Location
Shimla, Himachal Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
PRADHAN MANTRI GRAM SADAK YOJANA
Rofd, Protection Work, X-drainage Works, M/t Road Side Drain, Crash Barrier, Road Furniture And Dumping Structure In Km. 0/00 To 9/00 I/c Five Years Routine Maintenance) Under Pmgsy-iv - Upgradation of Kanhal to Bazathal road km 0.000 to 9.000 in District Shimla (HP) Under PMGSY-IV Batch-I. Package No. HP-09-826 (Sub Head:- ROFD, CD work , Retaining wall,Gabion Wall, Mettaling and Tarring, Panelled Cement Pavement , Drain ,Parapets, Crash Barrier, Road Safety Measure)
End Date
30 Mar 2026
7 days left
Location
Shimla, Himachal Pradesh
Department
Refer doc
Amount
₹ 7.84 Cr
Amount:
₹ 7.84 Cr
Jal Shakti Department
One hour left
Annual Repair M/o Lwss Namhol 1st Stage And Lwss Shilla In Tehsil Sadar Distt. Bilaspur (h.p.) (sh:- Repair Of Submersible Pump 6hp, Ms Make Set No. 1 Sr. No. 113126) Mono Submersible Pump 7.5 Hp Ksb Make Set No. Ii Sr. No. 211217003925 Sr. No. 1202551335003).
End Date
23 Mar 2026
One hour left
Location
Bilaspur (HP), Himachal Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Jal Shakti Department
One hour left
Retrofiting Of Various Ongoing Water Supply Scheme For Providing Fhtc Under Sh. Naina Devi Ji Constituency In Tehsil Sadar Distt. Bilaspur (h.p.) (sh:- Laying Jointing And Testing Of Gi Pipe 32mm Dia From Storage Tank At Leongari Brahmna Tank To Village Ghamrara G.p. Soldha). -
End Date
23 Mar 2026
One hour left
Location
Bilaspur (HP), Himachal Pradesh
Department
Refer doc
Amount
Refer doc
Amount:
Refer doc
Indian Army
7 hours left
Custom Bid for Services - 80000
End Date
23 Mar 2026
7 hours left
Location
Kangra, Himachal Pradesh
Department
Department Of Military Affairs
Amount
Refer doc
Amount:
Refer doc
Airports Authority Of India rhq Nr - Rangpuri
Custom Bid for Services - Deployment of manpower for operation of Airport Systems equipment and maintenance at Kangra Airport
End Date
03 Apr 2026
11 days left
Location
Kangra, Himachal Pradesh
Department
Airports Authority Of India aai
Amount
₹ 29.78 L
Amount:
₹ 29.78 L
Employees State Insurance Corporation esic
Security Manpower Service (Version 2.0) - Healthcare; Security Supervisor , Security Manpower Service (Version 2.0) - Healthcare; Unarmed Security Guard
End Date
28 Mar 2026
5 days left
Location
Solan, Himachal Pradesh
Department
Refer doc
Amount
₹ 3.3 Cr
Amount:
₹ 3.3 Cr
Select a tender to view details