- Splitting
- Advisory Bank
- Reserved for MII
- Reserved for MSE
- Bid to RA Enabled
- Evaluation Method
- MSE Purchase Preference
- MSE Exemption
Splitting
Advisory Bank
Reserved for MII
Reserved for MSE
Bid to RA Enabled
Evaluation Method
MSE Purchase Preference
MSE Exemption
Showing 8200 to 8225 of 8,661 results.
Western Railway
Supply Of Set Of Racers For Standard Size Journal Dia Of Wap7/ Wag9 3 Phase Locomotives Cosistiing Of Two Items Of M/s. Skf Technologies (india) Pvt. Ltd. (1) Plain Inner Racer For Sk F Cru-150 Axle Box Bearing- Skf Description - Irbc1-0174a =01 No. (2) Lipped Inner Racer For S Kf Cru-150 Axle Box Bearing -skf Description -ir-bc1-0156a=01 No. [ Warranty Period: 30 Month S After The Date Of Delivery ]
Western Railway
Supply Of Female Connector 28 Mm Od X 1 Inch Bsp(f) (for Double Ferrule Compression Tubefittings) As Per Drg No: Icf/std 3-5-107, Item N O 1. [ Warranty Period: 30 Months After The Date Of Delivery ]
Western Railway
Supply Of Radiator Fan Motor Of Hitachi Make Suitable For 3 Phase Medha Memu 3 Phase Induction Motor Model No.xch204007-bqh As Per Speci Fication Attached. [ Warranty Period: 30 Months After The Date Of Delivery ]
Western Railway
Supply Of Continious Rail Thermometer [ Warranty Period: 30 Months After The Date Of Delivery ]
Western Railway
Manufacturing And Supply Of Fish Bolts And Nuts Of Size 25 X 170 Mm To Rdso Drg No. T-11512 Alt. 2 Or Latest Alterations If Any, Use For Poin Ts & Crossing, Confirming To Irs Specifications Serial No.t-23: 2021 (redrafted) Or Latest Amendment If Any. [ Warranty Period: 30 Months After The Date Of Delivery ]
Western Railway
Supply Of Electronic Toe Load Measuring Device (etlmd) No.tm/sm/etlmd/218 (fourth Revision - 2022 ) [ Warranty Period: 30 Months After The Date Of Delivery ]
Western Railway
Supply Of Grinding Wheel Detail As Per Annexure Attached. [ Warranty Period: 30 Months After The Da Te Of Delivery ]
Western Railway
Supply Of Diclofenac Sod 25mg Per Ml 3ml Inj ]
Western Railway
Manufacturing And Supply Of Galvanized Bolts And Nuts For Steel Channel Sleeper On Guard Rail To Rdso Drg No. T-5164 Or Latest Alterations If Any, Confirming To Irs Specifications Serial No.t-23: 2021 (redrafted) Or Latest Amendment If Any. [ Warranty Period: 30 Months After The Date Of Deliver Y ]
Western Railway
Supply Of R/m Paint Synthetic Enamel, Exterior, Finishing, Color: White For Railway Coaches, Conforming To Is:8662/2024 (third Revision) And Rdso Amend Ment No. 1 (revision. 0) For Pigment Content As An Additional Requirement To Is: 8662/2024 With Additional Requirements Of Icf/md/spec.-045 Issue Status: 02 , Rev. No.-03 Dt.24/06/2007 [ Warranty Period: 12 Months After The Date Of Delivery ]
Western Railway
Supply Of Amoxycillin 125mg Per 5ml 60ml Syp ]
Western Railway
Supply Of Portable Dc Welding Generator. (as Per Rdso No. Tm/sm/20 Dt. 19.11.1992) Second Re Vision, 2022) [ Warranty Period: 30 Months After The Date Of Delivery ]
Western Railway
Corrigendum : Supply Of Rail Wear Gauge For 60kg. The Gauge Is Spring Loaded And Gives Direct Reading Of 6 0kg Rail Section. Brief Specifications Of The Gauge Are Under: 1 Measuring Least Count 1.0mm. 2. Measuring R Ange - 0-18mm. 3.reading Accuracy: 1.0mm. 4. Carrying Case: Cordura Brand Or Any Similar Export Quality Rail Wear Measuring Gauge. Guage Material : Aluminum And Stainless Steel Only. [ Warranty Period: 30 Months After The Date Of Delivery ]
Western Railway
Supply Of Locking Plate For Cartridge Tapered Roller Bearing (ctrb) Class E For Freight Stock To Rdso Drg. No. Wd-87019-s-1, Alt-3 And Other Technical Re Quirements Conforming To Rdso Str. No. Ab/rb-40-2016, Rev. 2 Of June-2021. [ Warranty Period: 30 Months After The Date Of Delivery ]
Western Railway
Supply Of Poh Kit For Dirt Collector Consisting Of Following 2 Items, I) Gasket, Drg. No. Wd-92051-s-05, Alt-5, Sheet-ii, Item-4, Qty.1/kit Ii) Washer, Drg. No . Wd-92051-s-05, Alt-5, Sheet-ii, Item-5, Qty. 1/kit Other Technical Requirements Confirming To Str. No. 02-abr-02, Appendix - E, Read With All Amendments, Latest Amend 4 Of Sept2016 [ Warranty Period: 30 Months After The Date Of Delivery ]
GAIL(INDIA)LIMITED
Renovation Of F And S Building At Gail Gandhar
Ministry of Road Trasnsport and Highways
Fdir/sr To Dhadhar River Major Bridge Between Km. 180/00 To 180/400 Of N.h. 64 In Bharuch District In The State Of Gujarat
Union Bank Of India
Tender For Interior Furnishing/electrical/ac Works For Umfb Sachin Branch Surat
Union Bank Of India
Tender Documents For Interior Furnishing Works For Ubi - Ubi - New Alkapuri, Union Bank Of India - Vadodara Region, Gujarat.
Union Bank Of India
Tender Documents For Renovation & Electrical Works For Ubi - New Alkapuri Branch, Union Bank Of India - Vadodara Region, Gujarat
Union Bank Of India
Tender Documents For Air Conditioning Works For Ubi - New Alkapuri Branch & E-lobby, Union Bank Of India - Vadodara Region, Gujarat
Union Bank Of India
Renovation Work Of Premises Of Narsanda Branch (branch Code 563064) (address: -opp Ratan Tekri,at & Post Narsanda Tal. Nadiad, Dist. Kheda 387345)
Union Bank Of India
Renovation Work Of Premises Of Petlad Branch (branch Code 534706) (address: -kajikui Chokshi Bazar, Petlad, 388450)
Union Bank Of India
Renovation Work Of Premises Of Borsad Branch (branch Code 917427) (address: -d.no.56, Bona Chambers, Near Gandhi Gunj Main Road, Borsad-388540, Borsad Taluk, District Anand)
Union Bank Of India
Renovation Work Of Premises Of Dohad Branch (branch Code 531049) (address: -near Jain Mandir Hanuman Bazar Dahod ,389151 Gujarat)