GeM Tenders
Found 555 tenders for your search.
Custom Bid for Services - ARC for Condition Monitoring Vibration Monitoring Health Assessment of rotary equipment at Guwahati Refinery 9010C24F42 Contract Period/ 2 Years MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Experience CriteriaBidder TurnoverCertificate Requested in ATCAdditional Doc 1 Requested in ATCAdditional Doc 2 Requested in ATCAdditional Doc 3 Requested in ATCAdditional Doc 4 Requested in ATC In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Bid to RA enabled/ No Type of Bid/Two Packet Bid Time allowed for Technical Clarifications during technical evaluation/ 5 Days Evaluation Method/ Total value wise evaluation
Read MorePublish Date | 20 Aug 2024 | |
Bid Submission End Date | 11 Sept 2024 | |
Earnest Amount | 48.7 K | |
Tender Amount | Refer Doc |
View Corrigendum | ||
Publish Date | 20 Aug 2024 | |
Bid Submission End Date | 11 Sept 2024 | |
Earnest Amount | XXXXXXX | |
Tender Amount | XXXXXXX |
96; CT RAIL PART NO. 1 MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Experience CriteriaAdditional Doc 1 Requested in ATCAdditional Doc 2 Requested in ATCAdditional Doc 3 Requested in ATCAdditional Doc 4 Requested in ATC In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Bid to RA enabled/3/ 3/ No Type of Bid/Two Packet Bid Time allowed for Technical Clarifications during technical evaluation/ 5 Days Inspection Required By Empanelled Inspection Authority / Agencies pre- registered with GeM No Evaluation Method/ Total value wise evaluation
Read MorePublish Date | 20 Aug 2024 | |
Bid Submission End Date | 12 Sept 2024 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 20 Aug 2024 | |
Bid Submission End Date | 12 Sept 2024 | |
Earnest Amount | XXXXXXX | |
Tender Amount | XXXXXXX |
1; Air Pre Heater MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Experience CriteriaAdditional Doc 1 Requested in ATC In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Bid to RA enabled/3/ 3/ No Type of Bid/Two Packet Bid Time allowed for Technical Clarifications during technical evaluation/ 6 Days Inspection Required By Empanelled Inspection Authority / Agencies pre- registered with GeM No Evaluation Method/ Total value wise evaluation
Read MorePublish Date | 20 Aug 2024 | |
Bid Submission End Date | 10 Sept 2024 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 20 Aug 2024 | |
Bid Submission End Date | 10 Sept 2024 | |
Earnest Amount | XXXXXXX | |
Tender Amount | XXXXXXX |
2; Soft Starter MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Experience CriteriaAdditional Doc 1 Requested in ATC In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Bid to RA enabled/3/ 3/ Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid/Two Packet Bid Time allowed for Technical Clarifications during technical evaluation/ 6 Days Inspection Required By Empanelled Inspection Authority / Agencies pre- registered with GeM No Evaluation Method/ Total value wise evaluation
Read MorePublish Date | 20 Aug 2024 | |
Bid Submission End Date | ||
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
View Corrigendum | ||
Publish Date | 20 Aug 2024 | |
Bid Submission End Date | ||
Earnest Amount | XXXXXXX | |
Tender Amount | XXXXXXX |
1; Procurement of spares for 49-K-01 and 49-K-03 MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Certificate Requested in ATCCompliance of BoQ specification and supporting document In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Bid to RA enabled/3/ 3/ No Type of Bid/Single Packet Bid Time allowed for Technical Clarifications during technical evaluation/ 4 Days Inspection Required By Empanelled Inspection Authority / Agencies pre- registered with GeM No Evaluation Method/ Total value wise evaluation
Read MorePublish Date | 22 Aug 2024 | |
Bid Submission End Date | 12 Sept 2024 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
View Corrigendum | ||
Publish Date | 22 Aug 2024 | |
Bid Submission End Date | 12 Sept 2024 | |
Earnest Amount | XXXXXXX | |
Tender Amount | XXXXXXX |
Custom Bid for Services - RPRC241241 Rate contract for expert supervisory services of Ms BHEL for analysis and troubleshooting of BHEL make Turbines Compressors installed at Panipat Refinery Petrochemical Complex Item 10 Expert Service Supervision .. Custom Bid for Services - RPRC241241 Rate contract for expert supervisory services of Ms BHEL for analysis and troubleshooting of BHEL make Turbines Compressors installed at Panipat Refinery Petrochemical Complex Item 20 Charges for overtime Hour.. Custom Bid for Services - RPRC241241 Rate contract for expert supervisory services of Ms BHEL for analysis and troubleshooting of BHEL make Turbines Compressors installed at Panipat Refinery Petrochemical Complex Item 30 Expert Service Supervision .. Custom Bid for Services - RPRC241241 Rate contract for expert supervisory services of Ms BHEL for analysis and troubleshooting of BHEL make Turbines Compressors installed at Panipat Refinery Petrochemical Complex Item 40 MobilisationDemobilisation Contract Period/ 2 Years MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Certificate Requested in ATCAdditional Doc 1 Requested in ATCAdditional Doc 2 Requested in ATC In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Read MorePublish Date | 22 Aug 2024 | |
Bid Submission End Date | 12 Sept 2024 | |
Earnest Amount | Refer Doc | |
Tender Amount | 5.22 Cr |
View Corrigendum | ||
Publish Date | 22 Aug 2024 | |
Bid Submission End Date | 12 Sept 2024 | |
Earnest Amount | XXXXXXX | |
Tender Amount | XXXXXXX |
Custom Bid for Services - Annual Rate Contract for Preparation of Drawings in Engineering Services Department of Guwahati Refinery 9010C24F46 Contract Period/ 2 Years MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Experience CriteriaBidder TurnoverCertificate Requested in ATCAdditional Doc 1 Requested in ATCAdditional Doc 2 Requested in ATCAdditional Doc 3 Requested in ATCAdditional Doc 4 Requested in ATC In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Bid to RA enabled/ No Type of Bid/Two Packet Bid Time allowed for Technical Clarifications during technical evaluation/ 5 Days Evaluation Method/ Total value wise evaluation
Read MorePublish Date | 22 Aug 2024 | |
Bid Submission End Date | 14 Sept 2024 | |
Earnest Amount | 19 K | |
Tender Amount | Refer Doc |
View Corrigendum | ||
Publish Date | 22 Aug 2024 | |
Bid Submission End Date | 14 Sept 2024 | |
Earnest Amount | XXXXXXX | |
Tender Amount | XXXXXXX |
3; Procurement of seal pots for 086-V-005 086-V-006 086-V- 008 of SRU MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Additional Doc 1 Requested in ATCAdditional Doc 2 Requested in ATCAdditional Doc 3 Requested in ATCAdditional Doc 4 Requested in ATCCompliance of BoQ specification and supporting document In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Bid to RA enabled/3/ 3/ No Type of Bid/Two Packet Bid Primary product category Procurement of seal pots for 086-V-005 086-V-006 086-V- 008 of SRU Time allowed for Technical Clarifications during technical evaluation/ 5 Days Inspection Required By Empanelled Inspection Authority / Agencies pre- registered with GeM No Evaluation Method/ Item wise evaluation/
Read MorePublish Date | 22 Aug 2024 | |
Bid Submission End Date | 12 Sept 2024 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 22 Aug 2024 | |
Bid Submission End Date | 12 Sept 2024 | |
Earnest Amount | XXXXXXX | |
Tender Amount | XXXXXXX |
3; Procurement of seal pots for 086-V-005 086-V-006 086-V- 008 of SRU MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Additional Doc 1 Requested in ATCAdditional Doc 2 Requested in ATCAdditional Doc 3 Requested in ATCAdditional Doc 4 Requested in ATCCompliance of BoQ specification and supporting document In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Bid to RA enabled/3/ 3/ No Type of Bid/Two Packet Bid Primary product category Procurement of seal pots for 086-V-005 086-V-006 086-V- 008 of SRU Time allowed for Technical Clarifications during technical evaluation/ 5 Days Inspection Required By Empanelled Inspection Authority / Agencies pre- registered with GeM No Evaluation Method/ Item wise evaluation/
Read MorePublish Date | 22 Aug 2024 | |
Bid Submission End Date | 12 Sept 2024 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 22 Aug 2024 | |
Bid Submission End Date | 12 Sept 2024 | |
Earnest Amount | XXXXXXX | |
Tender Amount | XXXXXXX |
Custom Bid for Services - Thickness testing of Station process piping and Hydrant Line Piping using Long Range Ultrasonic Thickness LRUT and Low Frequency Electromagnetic thickness LFET of PHBMPL Balasore Contract Period/ 4 Months MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Experience CriteriaCertificate Requested in ATC In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Bid to RA enabled/ No Type of Bid/Two Packet Bid Time allowed for Technical Clarifications during technical evaluation/ 4 Days Estimated Bid Value/ 359599.07 Evaluation Method/ Total value wise evaluation
Read MorePublish Date | 16 Aug 2024 | |
Bid Submission End Date | 10 Sept 2024 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
View Corrigendum | ||
Publish Date | 16 Aug 2024 | |
Bid Submission End Date | 10 Sept 2024 | |
Earnest Amount | XXXXXXX | |
Tender Amount | XXXXXXX |
72; Pump Bypass Valve Set Pressure 95 PSIG Size 2 Pump Bypass Valve Set Pressure 95 PSIG Size 3 Pump Bypass Valve Set Pressure 95 PSIG MOC SS304 size 2 MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Experience CriteriaCertificate Requested in ATC In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Bid to RA enabled/3/ 3/ No Type of Bid/Two Packet Bid Primary product category Pump Bypass Valve Set Pressure 95 PSIG Size 2 Time allowed for Technical Clarifications during technical evaluation/ 7 Days Inspection Required By Empanelled Inspection Authority / Agencies pre- registered with GeM No Evaluation Method/ Total value wise evaluation
Read MorePublish Date | 16 Aug 2024 | |
Bid Submission End Date | 16 Sept 2024 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
View Corrigendum | ||
Publish Date | 16 Aug 2024 | |
Bid Submission End Date | 16 Sept 2024 | |
Earnest Amount | XXXXXXX | |
Tender Amount | XXXXXXX |
Custom Bid for Services - RPRC242296 Rate Contract for Preventive Maintenance and miscellaneous repair jobs of Conveyor belt System of Solid Sulphur Handling Dispatch Unit of Panipat Refinery Contract Period/ 3 Years MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Experience CriteriaBidder TurnoverCertificate Requested in ATCAdditional Doc 1 Requested in ATCAdditional Doc 2 Requested in ATC In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Bid to RA enabled/ No Type of Bid/Two Packet Bid Time allowed for Technical Clarifications during technical evaluation/ 4 Days Estimated Bid Value/ 4299243 Evaluation Method/ Total value wise evaluation
Read MorePublish Date | 16 Aug 2024 | |
Bid Submission End Date | 16 Sept 2024 | |
Earnest Amount | 10.75 K | |
Tender Amount | Refer Doc |
View Corrigendum | ||
Publish Date | 16 Aug 2024 | |
Bid Submission End Date | 16 Sept 2024 | |
Earnest Amount | XXXXXXX | |
Tender Amount | XXXXXXX |
2; Heat Tracing Panel 400A incomer and 63A outgoing Heat Tracing Panel 200A incomer and 63A outgoing MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Additional Doc 1 Requested in ATCAdditional Doc 2 Requested in ATC In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Bid to RA enabled/3/ 3/ No Type of Bid/Two Packet Bid Primary product category Heat Tracing Panel 400A incomer and 63A outgoing Time allowed for Technical Clarifications during technical evaluation/ 4 Days Inspection Required By Empanelled Inspection Authority / Agencies pre- registered with GeM No Evaluation Method/ Item wise evaluation/
Read MorePublish Date | 16 Aug 2024 | |
Bid Submission End Date | 11 Sept 2024 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
View Corrigendum | ||
Publish Date | 16 Aug 2024 | |
Bid Submission End Date | 11 Sept 2024 | |
Earnest Amount | XXXXXXX | |
Tender Amount | XXXXXXX |
Custom Bid for Services - JG24FST208 AMC FOR CALIBRATION REPAIR AND MAINTENANCE OF PORTABLE GAS MONITORS IN GUJARAT REFINERY Contract Period/ 2 Years MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Experience CriteriaBidder TurnoverCertificate Requested in ATC In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Bid to RA enabled/ No Type of Bid/Two Packet Bid Time allowed for Technical Clarifications during technical evaluation/ 4 Days Estimated Bid Value/ 4191812.41 Evaluation Method/ Total value wise evaluation
Read MorePublish Date | 16 Aug 2024 | |
Bid Submission End Date | 13 Sept 2024 | |
Earnest Amount | 10.5 K | |
Tender Amount | Refer Doc |
View Corrigendum | ||
Publish Date | 16 Aug 2024 | |
Bid Submission End Date | 13 Sept 2024 | |
Earnest Amount | XXXXXXX | |
Tender Amount | XXXXXXX |
Custom Bid for Services - Directassessment ECDA ICDA of Haldia Oil JettyII Custom Bid for Services - Directassessment ECDA ICDA of IPPL to PHDPL Haldia Pipeline Contract Period/ 5 Months MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Experience CriteriaBidder TurnoverAdditional Doc 1 Requested in ATCAdditional Doc 2 Requested in ATCAdditional Doc 3 Requested in ATCAdditional Doc 4 Requested in ATC In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Bid to RA enabled/ No Type of Bid/Two Packet Bid Time allowed for Technical Clarifications during technical evaluation/ 4 Days Evaluation Method/ Total value wise evaluation
Read MorePublish Date | 16 Aug 2024 | |
Bid Submission End Date | 12 Sept 2024 | |
Earnest Amount | 22 K | |
Tender Amount | Refer Doc |
View Corrigendum | ||
Publish Date | 16 Aug 2024 | |
Bid Submission End Date | 12 Sept 2024 | |
Earnest Amount | XXXXXXX | |
Tender Amount | XXXXXXX |
Custom Bid for Services - Providing Acupressure and Sujok Therapy Services to IOCL Employees at BD Yusuf Sarai and BD East Kidwai Nagar Office New Delhi Contract Period/ 1 Years MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Experience CriteriaBidder TurnoverCertificate Requested in ATCAdditional Doc 1 Requested in ATCAdditional Doc 2 Requested in ATC In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Bid to RA enabled/ No Type of Bid/Two Packet Bid Time allowed for Technical Clarifications during technical evaluation/ 3 Days Evaluation Method/ Total value wise evaluation Financial Document Indicating Price Breakup Required/ Yes
Read MorePublish Date | 16 Aug 2024 | |
Bid Submission End Date | 10 Sept 2024 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
View Corrigendum | ||
Publish Date | 16 Aug 2024 | |
Bid Submission End Date | 10 Sept 2024 | |
Earnest Amount | XXXXXXX | |
Tender Amount | XXXXXXX |
Custom Bid for Services - RPRC246298 Hot and Cold jobs in M and I shutdowns at Panipat Refinery and Petrochemical Complex Contract Period/ 2 Years MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Experience CriteriaBidder TurnoverCertificate Requested in ATC In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Bid to RA enabled/ Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid/Two Packet Bid Time allowed for Technical Clarifications during technical evaluation/ 4 Days Estimated Bid Value/ 278483486.62 Evaluation Method/ Total value wise evaluation
Read MorePublish Date | 17 Aug 2024 | |
Bid Submission End Date | 12 Sept 2024 | |
Earnest Amount | 2.8 L | |
Tender Amount | Refer Doc |
View Corrigendum | ||
Publish Date | 17 Aug 2024 | |
Bid Submission End Date | 12 Sept 2024 | |
Earnest Amount | XXXXXXX | |
Tender Amount | XXXXXXX |
Custom Bid for Services - Expert supervision of Double Post PSV test bench by K Mass Control Pvt Ltd Line 10 Service Expert charges per day Custom Bid for Services - Expert supervision of Double Post PSV test bench by K Mass Control Pvt Ltd Line 20 Service Expert charges per day Sunday or Holiday Custom Bid for Services - Expert supervision of Double Post PSV test bench by K Mass Control Pvt Ltd Line 30 Basic Recalibration Certification Custom Bid for Services - Expert supervision of Double Post PSV test bench by K Mass Control Pvt Ltd Line 40 To and Fro Travel Charges Custom Bid for Services - Expert supervision of Double Post PSV test bench by K Mass Control Pvt Ltd Line 50 Accommodation charges Tender No BNS24ML093 Contract Period/ 2 Years MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Certificate Requested in ATCOEM Authorization CertificateAdditional Doc 1 Requested in ATCAdditional Doc 2 Requested in ATCAdditional Doc 3 Requested in ATCAdditional Doc 4 Requested in ATC In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Bid to RA enabled/ No
Read MorePublish Date | 17 Aug 2024 | |
Bid Submission End Date | 10 Sept 2024 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
View Corrigendum | ||
Publish Date | 17 Aug 2024 | |
Bid Submission End Date | 10 Sept 2024 | |
Earnest Amount | XXXXXXX | |
Tender Amount | XXXXXXX |
Custom Bid for Services - JG24IPT228 Annual Rate Contract for Near Field Array Inspection of Air Fin Cooler Tubes in various units during shutdown at Gujarat Refinery Contract Period/ 2 Years MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Experience CriteriaBidder TurnoverCertificate Requested in ATC In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Bid to RA enabled/ No Type of Bid/Two Packet Bid Time allowed for Technical Clarifications during technical evaluation/ 4 Days Estimated Bid Value/ 2362964.16 Evaluation Method/ Total value wise evaluation
Read MorePublish Date | 17 Aug 2024 | |
Bid Submission End Date | 11 Sept 2024 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
View Corrigendum | ||
Publish Date | 17 Aug 2024 | |
Bid Submission End Date | 11 Sept 2024 | |
Earnest Amount | XXXXXXX | |
Tender Amount | XXXXXXX |
Procurement and installation of condenser coils for Analyzer;676; COPPER CONDENSER COIL1015 X 510 X 3ROWS COPPER CONDENSER COIL1110 X 760 X 3ROW COPPER CONDENSER COIL1470 X 1020X 3ROWS HVAC FILTER DML 165 FREONR134A COMPRESSOR LUBE OIL RL32H Dismantling Installation testing and com
Read MorePublish Date | 17 Aug 2024 | |
Bid Submission End Date | 11 Sept 2024 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
View Corrigendum | ||
Publish Date | 17 Aug 2024 | |
Bid Submission End Date | 11 Sept 2024 | |
Earnest Amount | XXXXXXX | |
Tender Amount | XXXXXXX |
Procurement and installation of condenser coils for Analyzer;676; COPPER CONDENSER COIL1015 X 510 X 3ROWS COPPER CONDENSER COIL1110 X 760 X 3ROW COPPER CONDENSER COIL1470 X 1020X 3ROWS HVAC FILTER DML 165 FREONR134A COMPRESSOR LUBE OIL RL32H Dismantling Installation testing and com
Read MorePublish Date | 17 Aug 2024 | |
Bid Submission End Date | 11 Sept 2024 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
View Corrigendum | ||
Publish Date | 17 Aug 2024 | |
Bid Submission End Date | 11 Sept 2024 | |
Earnest Amount | XXXXXXX | |
Tender Amount | XXXXXXX |
Custom Bid for Services - RPNC242080 RFQ Line ITEM 00010 Sub Line Item 00010 AMC for Repair and servicing health check up of Eddy make installed EOT HOT crane Electrical Hoist at Panipat Naphtha Cracker Panipat Custom Bid for Services - RPNC242080 RFQ Line ITEM 00010 Sub Line Item 00020 AMC for Repair and servicing health check up of Eddy make installed EOT HOT crane Electrical Hoist at Panipat Naphtha Cracker Panipat Custom Bid for Services - RPNC242080 RFQ Line ITEM 00010 Sub Line Item 00030 AMC for Repair and servicing health check up of Eddy make installed EOT HOT crane Electrical Hoist at Panipat Naphtha Cracker Panipat Custom Bid for Services - RPNC242080 RFQ Line ITEM 00010 Sub Line Item 00040 AMC for Repair and servicing health check up of Eddy make installed EOT HOT crane Electrical Hoist at Panipat Naphtha Cracker Panipat Contract Period/ 2 Years MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ OEM Authorization CertificateAdditional Doc 1 Requested in ATCAdditional Doc 2 Requested in ATC In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Bid to RA enabled/ No
Read MorePublish Date | 19 Aug 2024 | |
Bid Submission End Date | 14 Sept 2024 | |
Earnest Amount | Refer Doc | |
Tender Amount | 16.01 L |
View Corrigendum | ||
Publish Date | 19 Aug 2024 | |
Bid Submission End Date | 14 Sept 2024 | |
Earnest Amount | XXXXXXX | |
Tender Amount | XXXXXXX |
1; Design Supply Installation And Commissioning of Complete 30.50 Meter National Flag Mast System alo MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Experience CriteriaCertificate Requested in ATCCompliance of BoQ specification and supporting document In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Bid to RA enabled/3/ 3/ No Type of Bid/Two Packet Bid Time allowed for Technical Clarifications during technical evaluation/ 7 Days Inspection Required By Empanelled Inspection Authority / Agencies pre- registered with GeM No Evaluation Method/ Total value wise evaluation
Read MorePublish Date | 12 Aug 2024 | |
Bid Submission End Date | 10 Sept 2024 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
View Corrigendum | ||
Publish Date | 12 Aug 2024 | |
Bid Submission End Date | 10 Sept 2024 | |
Earnest Amount | XXXXXXX | |
Tender Amount | XXXXXXX |
1; Air filter regulator cum lubricator MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Additional Doc 1 Requested in ATC In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Bid to RA enabled/3/ 3/ No Type of Bid/Single Packet Bid Time allowed for Technical Clarifications during technical evaluation/ 4 Days Inspection Required By Empanelled Inspection Authority / Agencies pre- registered with GeM No Evaluation Method/ Total value wise evaluation
Read MorePublish Date | 12 Aug 2024 | |
Bid Submission End Date | 10 Sept 2024 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
View Corrigendum | ||
Publish Date | 12 Aug 2024 | |
Bid Submission End Date | 10 Sept 2024 | |
Earnest Amount | XXXXXXX | |
Tender Amount | XXXXXXX |
1; Air filter regulator cum lubricator MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Additional Doc 1 Requested in ATC In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Bid to RA enabled/3/ 3/ No Type of Bid/Single Packet Bid Time allowed for Technical Clarifications during technical evaluation/ 4 Days Inspection Required By Empanelled Inspection Authority / Agencies pre- registered with GeM No Evaluation Method/ Total value wise evaluation
Read MorePublish Date | 12 Aug 2024 | |
Bid Submission End Date | 10 Sept 2024 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
View Corrigendum | ||
Publish Date | 12 Aug 2024 | |
Bid Submission End Date | 10 Sept 2024 | |
Earnest Amount | XXXXXXX | |
Tender Amount | XXXXXXX |