GeM Tenders
Found 700 tenders for your search.
3200; ADJUSTING BOLTS M24X160 AS PER DRG NO 6174-0031 REV. 02 AND INSPECTION CHECK LIST DOC NO ICL: 501. REV. -ADJUSTING BOLTS M24X250 AS PER DRG NO 6174- 0031 REV. 02 AND INSPECTION CHECK LIST DOC NO ICL: 501. REV ADJUSTING BOLTS M24X250 D25.4 AS PER DRG NO 6174-0031 REV. 02 AND INSPECTION CHECK LIST DOC NO ICL: MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Additional Doc 1 Requested in ATC In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Bid to RA enabled/3/ 3/ Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid/Two Packet Bid Primary product category ADJUSTING BOLTS M24X160 AS PER DRG NO 6174-0031 REV. 02 AND INSPECTION CHECK LIST DOC NO ICL: 501. REV. Time allowed for Technical Clarifications during technical evaluation/ 2 Days
Read MorePublish Date | 20 Aug 2024 | |
Bid Submission End Date | 10 Sept 2024 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
- Login to download
Publish Date | 20 Aug 2024 | |
Bid Submission End Date | 10 Sept 2024 | |
Earnest Amount | XXXXXXX | |
Tender Amount | XXXXXXX |
wafer;334; 961450000219-WAFER CHECK VALVE 219 point 1 X3 point 6 AS PER TDC GDQS024 REV 01 961450000323-WAFER CHECK VALVE 323 point 9X4 point 0 AS PER TDC GDQS024 REV 01 961450000457- WAFER CHECK VALVE 457X4 point 5 AS PER TDC GDQS024 REV 01 961450000508- WAFER CHECK VALVE 508X4 point 8 AS PER TDC GDQS024 REV 01 961450000660-WAFER CHECK VALVE 660 point 4X6 point 4 AS PER TDC GDQS024 REV 01
Read MorePublish Date | 20 Aug 2024 | |
Bid Submission End Date | 10 Sept 2024 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
- Login to download
Publish Date | 20 Aug 2024 | |
Bid Submission End Date | 10 Sept 2024 | |
Earnest Amount | XXXXXXX | |
Tender Amount | XXXXXXX |
7; MOISTURE MEASURING SYSTEM SENSOR MOISTURE MEASURING SYSTEM EXCLUDING MOISTURE SENSORS MOISTURE MEASURING SYSTEM INSTALLATION COMMISSIONING OF MOISTURE MEASURING SYSTEM MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Bid to RA enabled/ Yes RA Qualification Rule H1-Highest Priced Bid Elimination ITC available to buyer/ Yes Type of Bid/Two Packet Bid Primary product category MOISTURE MEASURING SYSTEM EXCLUDING MOISTURE SENSORS Time allowed for Technical Clarifications during technical evaluation/ 4 Days Inspection Required By Empanelled Inspection Authority / Agencies pre- registered with GeM No Evaluation Method/ Total value wise evaluation
Read MorePublish Date | 20 Aug 2024 | |
Bid Submission End Date | 10 Sept 2024 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
- Login to download
Publish Date | 20 Aug 2024 | |
Bid Submission End Date | 10 Sept 2024 | |
Earnest Amount | XXXXXXX | |
Tender Amount | XXXXXXX |
1; FLANGE ASSEMBLY PIPE FITTINGS MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Certificate Requested in ATCOEM Authorization CertificateAdditional Doc 1 Requested in ATCAdditional Doc 2 Requested in ATCAdditional Doc 3 Requested in ATCCompliance of BoQ specification and supporting document In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Bid to RA enabled/3/ 3/ Yes RA Qualification Rule 50 Lowest Priced Technically Qualified Bidders ITC available to buyer/ Yes Type of Bid/Two Packet Bid Time allowed for Technical Clarifications during technical evaluation/ 2 Days
Read MorePublish Date | 22 Aug 2024 | |
Bid Submission End Date | 12 Sept 2024 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
- Login to download
Publish Date | 22 Aug 2024 | |
Bid Submission End Date | 12 Sept 2024 | |
Earnest Amount | XXXXXXX | |
Tender Amount | XXXXXXX |
1; FLANGE ASSEMBLY PIPE FITTINGS MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Certificate Requested in ATCOEM Authorization CertificateAdditional Doc 1 Requested in ATCAdditional Doc 2 Requested in ATCAdditional Doc 3 Requested in ATCCompliance of BoQ specification and supporting document In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Bid to RA enabled/3/ 3/ Yes RA Qualification Rule 50 Lowest Priced Technically Qualified Bidders ITC available to buyer/ Yes Type of Bid/Two Packet Bid Time allowed for Technical Clarifications during technical evaluation/ 2 Days
Read MorePublish Date | 22 Aug 2024 | |
Bid Submission End Date | 12 Sept 2024 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
- Login to download
Publish Date | 22 Aug 2024 | |
Bid Submission End Date | 12 Sept 2024 | |
Earnest Amount | XXXXXXX | |
Tender Amount | XXXXXXX |
15000; LT HRPVC CONTROL CABLE 5C-4 ARMOURED MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Certificate Requested in ATCAdditional Doc 1 Requested in ATCCompliance of BoQ specification and supporting document In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Bid to RA enabled/3/ 3/ Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid/Two Packet Bid Time allowed for Technical Clarifications during technical evaluation/ 2 Days Inspection Required By Empanelled Inspection Authority / Agencies pre- registered with GeM No
Read MorePublish Date | 22 Aug 2024 | |
Bid Submission End Date | 10 Sept 2024 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
- Login to download
View Corrigendum | ||
Publish Date | 22 Aug 2024 | |
Bid Submission End Date | 10 Sept 2024 | |
Earnest Amount | XXXXXXX | |
Tender Amount | XXXXXXX |
456; DISCONNECTING SWITCH 95KV VAR 01 Adani Raigarh Ph II 2x800MW DISCONNECTING SWITCH 95KV VAR 01- NTPC LARA STPP STG-II2x800MW MSE Exemption for Turnover/ Yes Startup Exemption for Turnover/ Yes Document required from seller/ Certificate Requested in ATCAdditional Doc 1 Requested in ATCAdditional Doc 2 Requested in ATCAdditional Doc 3 Requested in ATCAdditional Doc 4 Requested in ATC In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Bid to RA enabled/ Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid/ Two Packet Bid Primary product category DISCONNECTING SWITCH 95KV VAR 01 Adani Raigarh Ph II 2x800MW Time allowed for Technical Clarifications during technical evaluation/ 2 Days
Read MorePublish Date | 22 Aug 2024 | |
Bid Submission End Date | 12 Sept 2024 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
- Login to download
Publish Date | 22 Aug 2024 | |
Bid Submission End Date | 12 Sept 2024 | |
Earnest Amount | XXXXXXX | |
Tender Amount | XXXXXXX |
9; OIL LEAKAGE MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Certificate Requested in ATCOEM Authorization CertificateAdditional Doc 1 Requested in ATCAdditional Doc 2 Requested in ATCCompliance of BoQ specification and supporting document In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Bid to RA enabled/3/ 3/ Yes RA Qualification Rule H1-Highest Priced Bid Elimination ITC available to buyer/ Yes Type of Bid/Two Packet Bid Time allowed for Technical Clarifications during technical evaluation/ 2 Days
Read MorePublish Date | 22 Aug 2024 | |
Bid Submission End Date | 12 Sept 2024 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
- Login to download
Publish Date | 22 Aug 2024 | |
Bid Submission End Date | 12 Sept 2024 | |
Earnest Amount | XXXXXXX | |
Tender Amount | XXXXXXX |
2; Turbine Thermal Insulation RML Chaliyama Application Service Turbine Thermal Insulation RML Chaliyama Minimum Average Annual Turnover of the bidder For 3 Years/ 3 3 3 Lakh s OEM Average Turnover Last 3 Years/ 3 3 3 Lakh s Years of Past Experience Required for same/similar service/ 23 23 3 Year s MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Experience CriteriaPast PerformanceBidder TurnoverCertificate Requested in ATCOEM Authorization CertificateOEM Annual TurnoverAdditional Doc 1 Requested in ATC In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Past Performance/50
Read MorePublish Date | 16 Aug 2024 | |
Bid Submission End Date | 10 Sept 2024 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
- Login to download
View Corrigendum | ||
Publish Date | 16 Aug 2024 | |
Bid Submission End Date | 10 Sept 2024 | |
Earnest Amount | XXXXXXX | |
Tender Amount | XXXXXXX |
4000; 12 FIBRES SINGLE MODE ARMOURED FIBRE OPTIC CABLE FOR CHILLA RMU MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Certificate Requested in ATCOEM Authorization CertificateAdditional Doc 1 Requested in ATCAdditional Doc 2 Requested in ATCAdditional Doc 3 Requested in ATCAdditional Doc 4 Requested in ATCCompliance of BoQ specification and supporting document In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Bid to RA enabled/3/ 3/ Yes RA Qualification Rule H1-Highest Priced Bid Elimination ITC available to buyer/ Yes Type of Bid/Two Packet Bid Time allowed for Technical Clarifications during technical evaluation/ 3 Days
Read MorePublish Date | 16 Aug 2024 | |
Bid Submission End Date | 11 Sept 2024 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
- Login to download
View Corrigendum | ||
Publish Date | 16 Aug 2024 | |
Bid Submission End Date | 11 Sept 2024 | |
Earnest Amount | XXXXXXX | |
Tender Amount | XXXXXXX |
2; INPA86039013 GOVERNING CONSOLE BOARD JINDAL MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Bid to RA enabled/ Yes RA Qualification Rule H1-Highest Priced Bid Elimination ITC available to buyer/ Yes Type of Bid/Two Packet Bid Time allowed for Technical Clari